Minimizing makespan on a two-machine re-entrant flowshop
نویسندگان
چکیده
This paper focuses on a two-machine re-entrant flowshop scheduling problem with the objective of minimizing makespan. In the re-entrant flowshop considered here, all jobs must be processed twice on each machine, that is, each job should be processed on machine 1, machine 2 and then machine 1 and machine 2. We develop dominance properties, lower bounds and heuristic algorithms for the problem, and use these to develop a branch and bound algorithm. For evaluation of the performance of the algorithms, computational experiments are performed on randomly generated test problems. Results of the experiments show that the suggested branch and bound algorithm can solve problems with up to 200 jobs in a reasonable amount of CPU time. Journal of the Operational Research Society (2007) 58, 972–981. doi:10.1057/palgrave.jors.2602220 Published online 14 June 2006
منابع مشابه
Solving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملHybrid tabu search for re-entrant permutation flow-shop scheduling problem
The assumption of classical shop scheduling problems that each job visits each machine only once (Baker, 1974) is often violated in practice. A new type of manufacturing shop, the reentrant shop has recently attracted attention. The basic characteristic of a re-entrant shop is that a job visits certain machines more than once. For example, in semiconductor manufacturing, consequently, each wafe...
متن کاملTwo-machine flowshop scheduling with flexible operations and controllable processing times
TWO-MACHINE FLOWSHOP SCHEDULING WITH FLEXIBLE OPERATIONS AND CONTROLLABLE PROCESSING TIMES Zeynep Uruk M.S. in Industrial Engineering Advisor: Prof. Dr. Selim Aktürk Co-Advisor: Asst. Prof. Dr. Hakan Gültekin August, 2011 In this study, we consider a two-machine flowshop scheduling problem with identical jobs. Each of these jobs has three operations, where the first operation must be performed ...
متن کاملHeuristics for a two-machine permutation flowshop with limited queue time constraint and arrival times in a semiconductor manufacturing line
In this research, we suggest some modified versions of existing heuristic algorithms for a two-machine flowshop scheduling problem, in which the each job has to be started on the second operation on the second machine within its assigned limited queue time after its first operation is completed on the first machine. The objective function of this scheduling problem is minimizing makespan. In ad...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- JORS
دوره 58 شماره
صفحات -
تاریخ انتشار 2007