The Maximum k-Dependent and f-Dependent Set Problem
نویسندگان
چکیده
منابع مشابه
A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this pap...
متن کاملMinimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملGENETIC AND TABU SEARCH ALGORITHMS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DETERIORATING JOBS
This paper introduces the effects of job deterioration and sequence dependent set- up time in a single machine scheduling problem. The considered optimization criterion is the minimization of the makespan (Cmax). For this purpose, after formulating the mathematical model, genetic and tabu search algorithms were developed for the problem. Since population diversity is a very important issue in ...
متن کاملA case report of temporary and acquired vitamin K-dependent clotting factor deficiency without any response to administrated vitamin K
Abstract Background and Objectives Vitamin K-dependent clotting factor deficiency (VKCFD) is usually an acquired problem due to liver disease, malabsorption, and overdose of warfarin. In the present paper the significance and role of vitamin K-dependent coagulation factors in menorrhagia were evaluated. Case We present a rare case of 43 year woman with acquired vitamin K deficiency and se...
متن کاملA Time Dependent Pollution Routing Problem in Multi-graph
This paper considers a time dependent(the travel time is not constant throughout the day) pollution routing problem (TDPRP), which aids the decision makers in minimizing travel time, toll cost and emitted pollution cost. In complexity of urban areas most of the time one point is accessible from another with more than one edge. In contrast to previous TDPRP models, which are designed with only ...
متن کاملA three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1993