Simulating the Transport and Scheduling of Priority Lots in Semiconductor Factories

نویسندگان

  • Chad D. DeJong
  • Scott P. Wu
چکیده

As high technology product market becomes more dynamic and competitive, chip manufacturers need to bring products to customers in short periods of time. As a result, semiconductor fabrication plants regularly contain lots with priority status. These lots have several unique characteristics compared to other production lots, both in terms of lot transport and scheduling on tools. These lots consume tool capacity that may impact the factory output rate. Priority lots also have specific policies for transport. The impact of these priority lots on other lots in the fab is not easily quantified, as many factors are involved. Dynamic factory and AMHS simulation models are capable of capturing the variability of a factory, and the interactions of critical constraints that prevent predictable manufacturing. This paper presents a breakthrough modeling approach to study the behaviors of priority lots, and to quantify their impact to manufacturing.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling the Effect of Hot Lots in Semiconductor Manufacturing Systems [Correspondence] - Semiconductor Manufacturing, IEEE Transactions on

The presence of hot lots or high-priority jobs in semiconductor manufacturing systems is known to significantly affect the cycle time and throughput of the regular lots since the hot lots get priority at all stages of processing. In this paper, we present an efficient analytical model based on re-entrant lines and use an efficient, approximate analysis methodology for this model in order to pre...

متن کامل

Chia - Nan Wang Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing

The more accurate the forecast is to lot delivery time, the more effective it is in fab scheduling. In fab operations, scheduling is the major impact factor of tools capacity allocation, tools utilization control and bottleneck management. However, there is no effective method to estimate delivery time in 300 mm automatic material handling systems (AMHS) operation. Computer simulations are auth...

متن کامل

An Optimal Utilization of Cloud Resources using Adaptive Back Propagation Neural Network and Multi-Level Priority Queue Scheduling

With the innovation of cloud computing industry lots of services were provided based on different deployment criteria. Nowadays everyone tries to remain connected and demand maximum utilization of resources with minimum timeand effort. Thus, making it an important challenge in cloud computing for optimum utilization of resources. To overcome this issue, many techniques have been proposed ...

متن کامل

A Simulation-based Analysis of the Cycle Time of Cluster Tools in Semiconductor Manufacturing

Cluster tools are widely used in modern semiconductor manufacturing facilities. In parallel mode they offer high throughput at the cost of a complex behaviour with regard to lot cycle times. The reason is that cluster tools are behave like small factories themselves. We analyze the slow-down of the processing of a lot that is caused by other lots in the tool and examine how the slowdown factor ...

متن کامل

Agent-based approach for cooperative scheduling

This paper studies the multi-factory production (MFP) network scheduling problem where a number of different individual factories join together to form a MFP network, in which these factories can operate more economically than operating individually. However, in such network which known as virtual production network with self-interested factories with transportation times, each individual facto...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002