Integrating Facilities Management Information a Process and Product Model Approach Integrating Facilities Management Information a Process and Product Model Approach

نویسندگان

  • Kjell Svensson
  • Hans Lindgren
چکیده

IX List of Used Acronyms or Abbreviations XI

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Quality function deployment: Integrating comprehensive matrix and SWOT analysis for effective decision making

In this ever-changing business scenario, the manufacturing product industries have to be in position to rec-ognize the ever changing pulse and demands of the market. Customer satisfaction and quality management has become a strategic issue for companies in the new millennium. Quality Function Deployment (QFD) lit-erature suggests that building up the House of Quality (HoQ) is not a difficult ta...

متن کامل

Risk management in medical product development process using traditional FMEA and fuzzy linguistic approach: a case study

Medical product development (MPD) process is highly multidisciplinary in nature, which increases the complexity and the associated risks. Managing the risks during MPD process is very crucial. The objective of this research is to explore risks during MPD in a dental product manufacturing company and propose a model for risk mitigation during MPD process to minimize failure events. A case study ...

متن کامل

Knowledge Management in Railway Industry: A Conceptual Model Based on Open Innovation and online Communities

Organizations need to be capable of attracting external knowledge. This activity is extremely related to innovation process and particularly to open innovation approach. Therefore, this qualitative research is designed to identify the dimensions and components for providing a conceptual model of KM architecture by open innovation approach based on online communities in the grounded theory frame...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

Managing Automotive Product Development

The new product development (NPD) is the process by which a new product idea is conceived, investigated, taken through the design process, manufactured, marketed and serviced. In Automotive Engineering these related to the product realization process (PRP) which consists of five phases: "Plan and Define Program", "Product Design and Development", "Process Design and...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998