A Case Study on Software Project Management in Industry – Experiences and Conclusions
نویسندگان
چکیده
In this paper we present and discuss the findings of two case studies on software project management in industrial software development projects and the conclusions drawn from it. These studies were motivated to improve software project management capabilities. First, we describe how these studies were organized and performed. In the main part we present our findings and conclusions showing that there are strong deficits in project management quality. Based on these findings we briefly describe the structure of an improvement program aiming to remove or reduce those deficits.
منابع مشابه
Quantitative risk management in gas injection project: a case study from Oman oil and gas industry
The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interv...
متن کاملProject Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)
Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...
متن کاملAn optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)
In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...
متن کاملMethodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...
متن کاملResilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)
Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...
متن کامل