A Lower Bound for the Time to Assure Interactive Consistency
نویسندگان
چکیده
fConttnua on ravaraa alda It nacaaaary and Idantity by block numbar)The problem of "assuring interactive consistency" is defined in [PSL].20 It is assumed that there are n isolated processors, of which at most m arefaulty. The processors can communicate by means of two-party messages, usinga medium which is reliable and of negligible delay. The sender of a messageis always identifiable by the receiver. Each processor p has a private valueo(p). The problem is to devise an algorithm that will allow each proce-sor pto compute a value for each processor .r, such that (a) if p and r are nonfaulty •»•* I JAN 71 1473 EDITION OF I NOV •• IS OBSOLETES/'N 0103-014-6601 IunclassifiedSECURITY CLASSIFICATION OF THIS PAGE (Whan Data tntarad)
منابع مشابه
An interactive weighted fuzzy goal programming technique to solve multi-objective reliability optimization problem
This paper presents an application of interactive fuzzy goal programming to the nonlinear multi-objective reliability optimization problem considering system reliability and cost of the system as objective functions. As the decision maker always have an intention to produce highly reliable system with minimum cost, therefore, we introduce the interactive method to design a high productivity sys...
متن کاملA New Lower Bound for Completion Time Distribution Function of Stochastic PERT Networks
In this paper, a new method for developing a lower bound on exact completion time distribution function of stochastic PERT networks is provided that is based on simplifying the structure of this type of network. The designed mechanism simplifies network structure by arc duplication so that network distribution function can be calculated only with convolution and multiplication. The selection of...
متن کاملA New Lower Bound for Completion Time Distribution Function of Stochastic PERT Networks
In this paper, a new method for developing a lower bound on exact completion time distribution function of stochastic PERT networks is provided that is based on simplifying the structure of this type of network. The designed mechanism simplifies network structure by arc duplication so that network distribution function can be calculated only with convolution and multiplication. The selection of...
متن کاملA New Lower Bound for Flexible Flow Shop Problem with Unrelated Parallel Machines
Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessme...
متن کاملHeuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Inf. Process. Lett.
دوره 14 شماره
صفحات -
تاریخ انتشار 1982