Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach
نویسندگان
چکیده
Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and imposed a high degree of uncertainty to the mine planning procedure while none of the existent algorithms of the pit limit determination consider the metal price uncertainty. Real Option Approach (ROA) is an efficient method of decision making in the condition of uncertainty. This approach usually used for evaluation of defined natural resources projects up to now. This study considering the metal price uncertainty used real option approach to prepare a methodology for determining the Ultimate Pit Limits (UPL). The study was carried out on a nonferrous metallic cylindrical ore deposit but the achieved methodology can be adjusted for all kinds of the deposits. The achieved methodology was comprehensively described through the examples in a way that can be used by the mine planners.
منابع مشابه
Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach
Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...
متن کاملA Hybrid Fuzzy MCDM Approach to Determine an Optimal Block Size in Open-Pit Mine Modeling: a Case Study
The computer-based 3D modeling of ore bodies is one of the most important steps in the resource estimation, grade determination, and production scheduling of open-pit mines. In the modeling phase, the volume of the orebody model is required to be filled by the blocks and sub-blocks. The determination of Block Size (BS) is important due to the dependence of the geostatistical issues and calculat...
متن کاملDetermination of the largest pit with the non-negative net profit in the open pit mines
The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...
متن کاملUPL determination of multi-element deposits with grade uncertainty using a new block economic value calculation approach
The block economic value (BEV) of a single-metal deposit is calculated based on the metal content and the related costs. The common methods available for calculating BEV are just based upon the profitable elements, and the effects of undesirable elements on BEV are not considered. However, in multi-element deposits, the effects of other elements existing in the blocks on BEV should be considere...
متن کاملA New Algorithm for Determining Ultimate Pit Limits Based on Network Optimization
One of the main concerns of the mining industry is to determine ultimate pit limits. Final pit is a collection of blocks, which can be removed with maximum profit while following restrictions on the slope of the mine’s walls. The size, location and final shape of an open-pit are very important in designing the location of waste dumps, stockpiles, processing plants, access roads and other surfac...
متن کامل