Pharmaceutical companies are allowed to deal in generic or brand medications and medical devices. Thus it is essential that the product conforms to specified customer requirements. In order to analyse the performance of the process, the critical factors which influence the production are evaluated. The objective of the study is to simulate the pharmaceutical production line using ARENA software and optimize the line by Design of Experiments technique in MINITAB by considering the response factor ‘work in progress’. The critical factors identified are batch size, transfer time and the number of resources. A Taguchi approach is employed to gather experimental data. Then, based on signal-to-noise (S/N) ratio, the best sets critical parameters have been determined. Using these parameters values, the ‘work in progress’ may be minimized.
منابع مشابه
Layout Design of a Furniture Production Line Using Formal Methods
This paper experiments application of different heuristic approaches to a real facility layout problem at a furniture manufacturing company. All the models are compared using AHP, where a number of parameters of interest are employed. The experiment shows that formal layout modelling approaches can be effectively used real problems faced in industry, leading to significant improvements.
متن کاملEmergency department resource optimisation for improved performance: a review
Emergency departments (EDs) have been becoming increasingly congested due to the combined impacts of growing demand, access block and increased clinical capability of the EDs. This congestion has known to have adverse impacts on the performance of the healthcare services. Attempts to overcome with this challenge have focussed largely on the demand management and the application of system wide p...
متن کاملReduction of production disturbances of a shoemaking industry through a discrete event simulation approach
This study presents a reduction of production disturbances of a shoemaking industry through discrete event simulation approach. The study is conducted at Peacock Shoe factory found in Addis Ababa, Ethiopia. This factory faces line balancing problem that becomes production disturbance for its assembly lines. Detail time study is carried out for the selected shoe model using stopwatch. Assembly ...
متن کاملStudy on implementation of one-piece lean line design using simulation techniques: A practical approach
This paper discusses the simulation study carried out for proposing one-piece lean line layout with features of Lean Manufacturing. The lean initiatives that can be addressed are, introducing Kanban replenishment sys-tem, better work-in-process, changing the layout, visual management techniques, standardized work for the re-duction of cycle time, number of workers, number of setups. To improve ...
متن کاملDetermining production level under uncertainty using fuzzy simulation and bootstrap technique, a case study
In every production plant, it is necessary to have an estimation of production level. Sometimes there are many parameters affective in this estimation. In this paper, it tried to find an appropriate estimation of production level for an industrial factory called Barez in an uncertain environment. We have considered a part of production line, which has different production time for different kin...