A Markovian model for the hybrid manufacturing planning and control method 'Double Speed Single Production Line'
نویسندگان
چکیده
In this paper, the hybrid production planning & control method Double Speed Single Production Line (DSSPL) is presented, modeled and its performances evaluated and compared to classical Production Planning and Control methods (PPC). DSSPL combines JIT/kanban and Material Requirement Planning for the production of different classes of products (Aand B-items based on a market or customer oriented analysis) on one single production line. By the use of a Markovian birth-death queuing model of a single-stage, two-product production system, the performance and the behavior of the basic DSSPL concept are analyzed and compared to the classical MRP concepts. Its capability to cope with limited resources is illustrated with an industrial case study where DSSPL has been implemented to solve coordination problems between a plastic molding feeder shop and the final assembly line of a micromotor producer.
منابع مشابه
A novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study
Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...
متن کاملDynamic Multi Period Production Planning Problem with Semi Markovian Variable Cost (TECHNICAL NOTE)
This paper develops a method for solving the single product multi-period production-planning problem, in which the production and the inventory costs of each period arc concave and backlogging is not permitted. It is also assumed that the unit variable cost of the production evolves according to a continuous time Markov process. We prove that this production-planning problem can be Stated as a ...
متن کاملMulti-site production planning in hybrid make-to-stock/make-to-order production environment
Today competitive environment has enforced practitioners and researchers to pay great attention to issues enhancing both production and marketing competitiveness. To do so, it has been obligatory for the firms to consider production side activities while customer requirements are on the other side of competition. In this regard, hybrid make-to-stock (MTS)/make-to-order (MTO) production systems ...
متن کاملUsing Markov Chain to Analyze Production Lines Systems with Layout Constraints
There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of lin...
متن کاملMonte Carlo Simulation to Compare Markovian and Neural Network Models for Reliability Assessment in Multiple AGV Manufacturing System
We compare two approaches for a Markovian model in flexible manufacturing systems (FMSs) using Monte Carlo simulation. The model which is a development of Fazlollahtabar and Saidi-Mehrabad (2013), considers two features of automated flexible manufacturing systems equipped with automated guided vehicle (AGV) namely, the reliability of machines and the reliability of AGVs in a multiple AGV jobsho...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 57 شماره
صفحات -
تاریخ انتشار 2009