Product Aggregation Bias as a Specification Error in Demand Systems

نویسنده

  • George C. Davis
چکیده

Your use of the JSTOR archive indicates your acceptance of JSTOR's Terms and Conditions of Use, available at http://www.jstor.org/about/terms.html. JSTOR's Terms and Conditions of Use provides, in part, that unless you have obtained prior permission, you may not download an entire issue of a journal or multiple copies of articles, and you may use content in the JSTOR archive only for your personal, non-commercial use.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

CEP Discussion Paper No 699 July 2005 Products and Productivity

Firms' decisions about which goods to produce are often made at a more disaggregate level than the data observed by empirical researchers. When products differ according to production technique or the way in which they enter demand, this data aggregation problem introduces a bias into standard measures of firm productivity. We develop a theoretical model of heterogeneous firms endogenously self...

متن کامل

The effects of forecasting errors and mis-specification

This paper represents a long-standing collaboration between Robert Fildes and Brian Kingsman who sadly died before it could be completed. This paper proposes a methodology for examining the effect of demand uncertainty and forecast error on lot sizing methods, unit costs and customer service levels in MRP type manufacturing systems. A number of cost structures were considered which depend on th...

متن کامل

A New Nonlinear Specification of Structural Breaks for Money Demand in Iran

In a structural time series regression model, binary variables have been used to quantify qualitative or categorical quantitative events such as politic and economic structural breaks, regions, age groups and etc. The use of the binary dummy variables is not reasonable because the effect of an event decreases (increases) gradually over time not at once. The simple and basic idea in this paper i...

متن کامل

Bi-product inventory planning in a three-echelon supply chain with backordering, Poisson demand, and limited warehouse space

In this paper, we apply continuous review (S-1, S) policy for inventory control in a three-echelon supply chain (SC) including r identical retailers, a central warehouse with limited storage space, and two independent manufacturing plants which offer two kinds of product to the customer. The warehouse of the model follows (M/M/1) queue model where customer demands follow a Poisson probabilit...

متن کامل

Evaluation of monthly gridded precipitation data products ERA-Interim, PERSIANN-CDR, PERSIANN-CCS and CRU over Khuzestan province

Deficiency and inappropriate distribution of reengage station is one of challenges faced by researchers in hydrology and climate science. In this research, evaluate the applicability of four gridded precipitation data products ERA-Interim, PERSIANN-CDR, PERSIANN-CCS and CRU as a supplement or substitute for ground data in a monthly time scales. This assessment was done by comparison with observ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008