Lost in Development’s Shadow: The Downstream Human Consequences of Dams

نویسندگان

  • Brian D. Richter
  • Sandra Postel
  • Carmen Revenga
  • Bernhard Lehner
  • Allegra Churchill
چکیده

The World Commission on Dams (WCD) report documented a number of social and environmental problems observed in dam development projects. The WCD gave particular emphasis to the challenges of properly resettling populations physically displaced by dams, and estimated the total number of people directly displaced at 40-80 million. Less attention has been given, however, to populations living downstream of dams whose livelihoods have been affected by dam-induced alterations of river flows. By substantially changing natural flow patterns and blocking movements of fish and other animals, large dams can severely disrupt natural riverine production systems – especially fisheries, flood-recession agriculture and dry-season grazing. We offer here the first global estimate of the number of river-dependent people potentially affected by dam-induced changes in river flows and other ecosystem conditions. Our conservative estimate of 472 million river-dependent people living downstream of large dams along impacted river reaches lends urgency to the need for more comprehensive assessments of dam costs and benefits, as well as to the social inequities between dam beneficiaries and those potentially disadvantaged by dam projects. We conclude with three key steps in dam development processes that could substantially alleviate the damaging downstream impacts of dams.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Classification of Scouring Form of Homogeneous and Sticky Earth Dams in Overtopping

The objective of this study was to investigate how the earth dam is destroyed due to the effect of upstream and downstream slope of the body in overflow conditions. Therefore, eight models were provided that each model is constructed from the embankment dam with different upstream and downstream slopes (1:1, 2:1) and the soil properties (Sc) on breach formation. The time and method of dam break...

متن کامل

Analysis of the Inter-Basin Water Transfer Project from the Halilrood upstream with consideration of downstream effects

  Abstract Given the importance of water resources in sustainable development, it is necessary to investigate the direct and indirect impacts of inter-basin water transfer projects. The present research analyzed the status of the water resources in the south of Kerman province and the challenges of inter-basin water transfer that will result from transferring water from the upstream Halilroo...

متن کامل

Human Life Saving by Simulation of Dam Break Using Flow-3d (a Case Study: Upper Gotvand Dam)

Dam break analysis plays a very important role in the risk assessment of dams. Large dams pose significantly higher risks to the people and property downstream of the dam as compared to smaller dams. So the flooding risk due to the possible failure of large dams is more crucial. The simulation of exceptional events characterized by high hydraulic and hydro-geologic risk is an actual problem for...

متن کامل

Qualitative and Quantitative Assessment of Check-dams Effectiveness for Flood Sediment Deposition (Case Study: Dam-tang Watershed, Darab)

One of the simple methods for erosion control, flood mitigation and flood damage reduction in the streams is building the check-dams. The present study was carried out to evaluate the performance of check-dams, location across the streams in the retention of the fine sediments in Dam-tang watershed in Darab Iran. For this purpose, two of streams with many stabilized check-dams which were more t...

متن کامل

Parametric Evaluation of the Static Stability Analysis of the Asphaltic Concrete Core Rockfill Dams

The present study examined the effect of the geometric parameters of the Rockfill dams on the 2D static analysis of slope stability. In this regard, several numerical models analyzed for eight heights, three slopes of upstream and downstream, three vertical and skewed core thicknesses and four different impounding time stages namely, "End of Construction", "Full Reservoir", "Half Full Reservoir...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010