A Pomset-Based Model for Estimating Workcells' Setups in Assembly Sequence Planning

نویسندگان

  • Carmelo Del Valle
  • Miguel Toro
  • Rafael Ceballos
  • Jesús S. Aguilar-Ruiz
چکیده

This paper presents a model based on pomsets (partially ordered multisets) for estimating the minimum number of setups in the workcells in Assembly Sequence Planning. This problem is focused through the minimization of the makespan (total assembly time) in a multirobot system. The planning model considers, apart from the durations and resources needed for the assembly tasks, the delays due to the setups in the workcells. An A* algorithm is used to meet the optimal solution. It uses the And/Or graph for the product to assemble, that corresponds to a compressed representation of all feasible assembly plans. Two basic admissible heuristic functions can be defined from relaxed models of the problem, considering the precedence constraints and the use of resources separately. The pomset-based model presented in this paper takes into account the precedence constraints in order to obtain a better estimation for the second heuristic function, so that the performance of the algorithm could be improved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

A two-stage stochastic rule-based model to determine pre-assembly buffer content

This study considers instant decision-making needs of the automobile manufactures for resequencing vehicles before final assembly (FA). We propose a rule-based two-stage stochastic model to determine the number of spare vehicles that should be kept in the pre-assembly buffer to restore the altered sequence due to paint defects and upstream department constraints. First stage of the model decide...

متن کامل

A Multi-objective Mixed Model Two-sided Assembly Line Sequencing Problem in a Make –To- Order Environment with Customer Order Prioritization

Mixed model two-sided assembly lines (MM2SAL) are applied to assemble large product models, which is produced in high-volume. So, the sequence planning of products to reduce cost and increase productivity in this kind of lines is imperative. The presented problem is tackled in two steps. In step 1, a framework is developed to select and prioritize customer orders under the finite capacity of th...

متن کامل

Group sequencing a PCB assembly system via an expected sequence dependent setup heuristic

In circuit board manufacturing, the production sequencing problem with sequence dependent setups is complicated by the fact that the amount of setup required depends on not only the setup directly before the current setup, but can depend on all of the preceding setups. We present a case study that examines the use of a heuristic for estimating the expected number of setups from the sequence dep...

متن کامل

A Hybrid Unconscious Search Algorithm for Mixed-model Assembly Line Balancing Problem with SDST, Parallel Workstation and Learning Effect

Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002