This paper describes process models that characterize the design phase in the supply chain of pipe supports used in power plants. The models are used to study how production system design factors such as batching, uncertainty, and multitasking throughout this phase hamper supply chain performance. These factors all cause an increase in lead time. The models build on the STROBOSCOPE discrete-event simulation engine and illustrate several deterministic and probabilistic simulation scenarios including different batch sizes, uncertainty levels, and allocation percentages of shared resources. Based on the analysis of the simulation results, this paper recommends performance improvement opportunities that apply not only to the supply chain of pipe supports but generally to the delivery of capital projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Value Stream Analysis of Construction Supply Chains: Case Study on Pipe Supports Used in Power Plants

Waste is omnipresent in construction supply chains. It often occurs at the interface between processes, disciplines, or organizations. To illustrate several causes of waste, this paper focuses on a case study that documents the most common configuration of the supply chain for pipe supports used in the power plant industry. Using value-stream mapping across organizational boundaries, this paper...

متن کامل

Alternative Supply-chain Configurations for Engineered or Catalogued Made-to- Order Components:case Study on Pipe Supports Used in Power Plants

Many construction inefficiencies are due to supply-chain (SC) problems that occur at the interface between processes or disciplines. This paper illustrates such problems by describing a case study on the supply of pipe supports used in power plants. Pipe supports often arrive late at the construction site because their design tends to be pushed towards the end of the power plant design process ...

متن کامل

EQUILIBRIUM FOR PROCUREMENT STRATEGY BETWEEN TRIAD COMPETITIVE SUPPLY CHAINS

In today complex worldwide supply chains, intermediary organizations like Contract manufacturers and GPOs are mostly used. Well-known OEMs delegate their purchasing and procuring to these intermediaries. Because of their positive influence on supply chain efficiency, it is very important to investigate the role of intermediaries in today competitive supply chains. One important question arising...

متن کامل

On the Bullwhip Effect Measure in Supply Chains with VAR (1) Demand Process

In this paper, a two-echelon supply chain, which includes two products based on the following considerations, has been studied and the bullwhip effect is quantified. Providing a measure for bullwhip effect that enables us to analyze and reduce this phenomenon in supply chains with two products is the basic purpose of this paper. Demand of products is presented by the first order vector autoregr...

متن کامل

Feasibility of building wind power plants in coastal areas of the country using GIS (case study: Khuzestan province)

In Iran, due to the high rate of economic growth and development activities, the annual demand for various energies, including electrical energy, has increased, as a result of which the construction of new power plants has become an undeniable necessity. Considering the evolution of energy in the current century and the need for renewable energies, the use of wind energy and the establishment o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002