A multi-objective resource allocation problem in PERT networks

نویسندگان

  • Amir Azaron
  • Hideki Katagiri
  • Masatoshi Sakawa
  • Kosuke Kato
  • Azizollah Memariani
چکیده

We develop a multi-objective model for resource allocation problem in PERT networks with exponentially or Erlang distributed activity durations, where the mean duration of each activity is a non-increasing function and the direct cost of each activity is a non-decreasing function of the amount of resource allocated to it. The decision variables of the model are the allocated resource quantities. The problem is formulated as a multi-objective optimal control problem that involves four conflicting objective functions. The objective functions are the total direct costs of the project (to be minimized), the mean of project completion time (min), the variance of project completion time (min), and the probability that the project completion time does not exceed a certain threshold (max). The surrogate worth trade-off method is used to solve a discrete-time approximation of the original problem. 2005 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi Objective Fibonacci Search Based Algorithm for Resource Allocation in PERT Networks

The problem we investigate deals with the optimal assignment of resources to the activities of a stochastic project network. We seek to minimize the expected cost of the project include sum of resource utilization costs and lateness costs. We assume that the work content required by the activities follows an exponential distribution. The decision variables of the model are the allocated resourc...

متن کامل

A heuristic method for consumable resource allocation in multi-class dynamic PERT networks

This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different arrival rates. Each activity of any project is operated at a devoted service station located in a n...

متن کامل

Bicriteria Resource Allocation Problem in Pert Networks

We develop a bicriteria model for the resource allocation problem in PERT networks, in which the total direct costs of the project as the first objective, and the mean of project completion time as the second objective are minimized. The activity durations are assumed to be independent random variables with either exponential or Erlang distributions, in which the mean of each activity duration ...

متن کامل

Resource allocation in multi-server dynamic PERT networks using multi-objective programming and Markov process

In this research, both resource allocation and reactive resource allocation problems in multi-server dynamic PERT networks are analytically modeled, where new projects are expected to arrive according to a Poisson process, and activity durations are also known as independent random variables with exponential distributions. Such system is represented as a queuing network, where multi servers at ...

متن کامل

Constrained consumable resource allocation in alternative stochastic networks via multi-objective decision making

Many real projects complete through the realization of one and only one path of various possible network paths. Here, these networks are called alternative stochastic networks (ASNs). It is supposed that the nodes of considered network are probabilistic with exclusive-or receiver and exclusive-or emitter. First, an analytical approach is proposed to simplify the structure of t...

متن کامل

A heuristic method for consumable resource allocation in multi-class dynamic PERT networks

This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different arrival rates. Each activity of any project is operated at a devoted service station located in a node...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 172  شماره 

صفحات  -

تاریخ انتشار 2006