We study the classical problem of scheduling a set of independent jobs with release dates on a single machine. There exists a huge literature on the preemptive version of the problem, where the jobs can be interrupted at any moment. However, we focus here on the non-preemptive case, which is harder, but more relevant in practice. For instance, the jobs submitted to actual high performance platforms cannot be interrupted or migrated once they start their execution (due to prohibitive management overhead). We target on the minimization of the total stretch objective, defined as the ratio of the total time a job stays in the system (waiting time plus execution time), normalized by its processing time. Stretch captures the quality of service of a job and the minimum total stretch reflects the fairness between the jobs. So far, there have been only few studies about this problem, especially for the non-preemptive case. Our approach is based to the usage of the classical and efficient for the preemptive case shortest remaining processing time (SRPT) policy as a lower bound. We investigate the (offline) transformation of the SRPT schedule to a non-preemptive schedule subject to a recently introduced resource augmentation model, namely the rejection model according to which we are allowed to reject a small fraction of jobs. Specifically, we propose a 2 ǫ -approximation algorithm for the total stretch minimization problem if we allow to reject an ǫ-fraction of the jobs, for any ǫ > 0. This result shows that the rejection model is more powerful than the other resource augmentations models studied in the literature, like speed augmentation or machine augmentation, for which non-polynomial or non-scalable results are known. As a byproduct, we present a 1 ǫ -approximation algorithm for the total flow-time minimization problem which also rejects at most an ǫ-fraction of jobs.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multiprocessor System with Non-Preemptive Earliest-Deadline-First Scheduling Policy: A Performability Study

This paper introduces an analytical method for approximating the performability of a firm realtime system modeled by a multi-server queue. The service discipline in the queue is earliestdeadline- first (EDF), which is an optimal scheduling algorithm. Real-time jobs with exponentially distributed relative deadlines arrive according to a Poisson process. All jobs have deadlines until the end of s...

متن کامل

An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems

In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...

متن کامل

The Case for Non-Preemptive Scheduling in Distributed Real-Time Systems

Contrary to traditional belief, we show in this paper, that for distributed systems non-preemptive scheduling can perform better than preemptive scheduling in the worst case in terms of task schedulability, under certain circumstances. We derive a worst-case delay bound for tasks scheduled using non-preemptive scheduling in a distributed system, where the task flow paths form a directed acyclic...

متن کامل

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016