A branch-price-and-cut method for the vegetable crop rotation scheduling problem with minimal plot sizes

نویسندگان

  • Lana Mara Rodrigues dos Santos
  • Pedro Munari
  • Alysson M. Costa
  • Ricardo Henrique Silva Santos
چکیده

Crop rotation plays an important role in agricultural production models with sustainability considerations. Commonly associated strategies include the alternation of botanical families in the plots, the use of fallow periods and the inclusion of green manure crops. In this article, we address the problem of scheduling vegetable production in this context. Vegetables crop farmers usually manage a large number of crop species with different planting periods and growing times. These crops present multiple and varied harvesting periods and productivities. The combination of such characteristics makes the generation of good vegetable crop rotation schedules a hard combinatorial task. We approach this problem while considering two additional important practical aspects: standard plot sizes (multiples of a base area) and total area minimisation. We propose an integer programming formulation for this problem and develop a branch-price-and-cut algorithm that includes several performance-enhancing characteristics, such as the inclusion of a family of subadditive valid inequalities, two primal heuristics and a strong branching rule. Extensive computational experiments over a set of instances based on real-life data validate the efficiency and robustness of the proposed method.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Mathematical Model and a Solution Method for Hybrid Flow Shop Scheduling

This paper studies the hybrid flow shop scheduling where the optimization criterion is the minimization of total tardiness. First, the problem is formulated as a mixed integer linear programming model. Then, to solve large problem sizes, an artificial immune algorithm hybridized with a simple local search in form of simulated annealing is proposed. Two experiments are carried out to evaluate th...

متن کامل

Stochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation

This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...

متن کامل

Flexible flowshop scheduling with equal number of unrelated parallel machines

This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...

متن کامل

An Efficient Bi-objective Genetic Algorithm for the Single Batch-Processing Machine Scheduling Problem with Sequence Dependent Family Setup Time and Non-identical Job Sizes

This paper considers the problem of minimizing make-span and maximum tardiness simultaneously for scheduling jobs under non-identical job sizes, dynamic job arrivals, incompatible job families,and sequence-dependentfamily setup time on the single batch- processor, where split size of jobs is allowed between batches. At first, a new Mixed Integer Linear Programming (MILP) model is proposed for t...

متن کامل

A branch-and-price-and-cut approach for sustainable crop rotation planning

In this paper, we study a multi-periodic production planning problem in agriculture. This problem belongs to the class of crop rotation planning problems, which have received increased attention in the literature in recent years. Crop cultivation and fallow periods must be scheduled on land plots over a given time horizon so as to minimize the total surface area of land used, while satisfying c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 245  شماره 

صفحات  -

تاریخ انتشار 2015