ISO 21500: 2012 and PMBoK 5 processes in information systems project management
نویسندگان
چکیده
The purpose of this research is to contribute to a better understanding of information systems (IS) project management practice, by investigating the ISO 21500:2012/PMBoK 5 processes implemented by project managers in this kind of projects. Responses to an international web-based survey, representing 472 projects in total, showed that processes from knowledge areas as, for instance, scope management, cost management, and time management, are frequently implemented. However, there are processes from important areas as, for instance, quality management and risk management, that are being relegated to a second plane, what is a matter of concerning. Since IS projects do not have a very good reputation concerning success, these results can be of outmost importance to help researchers and practitioners to improve project management performance.
منابع مشابه
Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)
Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...
متن کاملOutsourcing and Acquisition Models Comparison Related to IT Supplier Selection Decision Analysis
This paper presents a comparison of acquisition models related to decision analysis of IT supplier selection. The main standards are: Capability Maturity Model Integration for Acquisition (CMMI-ACQ), ISO / IEC 12207 Information Technology / Software Life Cycle Processes, IEEE 1062 Recommended Practice for Software Acquisition, the IT Infrastructure Library (ITIL) and the Project Management Body...
متن کاملApplication of the enterprise management tools Lean Six Sigma and PMBOK in developing a program of research management Aplicação das ferramentas de gestão empresarial Lean Seis Sigma e PMBOK no desenvolvimento de um programa de gestão da pesquisa científica
Conflict of interest: none. aBstRact objective: Introduce a program for the management of scientific research in a General Hospital employing the business management tools Lean Six Sigma and PMBOK for project management in this area. methods: The Lean Six Sigma methodology was used to improve the management of the institution’s scientific research through a specific tool (DMAIC) for identificat...
متن کاملSoftware Project Costing: Coupling CMMI and PMBOK into a Generic Costing Framework
This study puts forward a generic and comprehensive costing framework for software projects that aims for simplicity. This is achieved by integrating commonly used CMMI (Capability Maturity Model Integration) and PMBOK (Project Management Body of Knowledge) costing concepts in a broader organizational context. The costing framework comprises three layers: costing targets, costing activities, an...
متن کاملبررسی شکلی و محتوایی انواع استانداردهای مدیریت پروژه با دامنه ی جهانی
مدیرانی که بهدنبال استقرار یکی از استانداردهای مدیریت پروژه هستند در انتخاب استانداردها و روششناسیهای متعددی که در این زمینه وجود دارد دچار سردرگمی و ابهام میشوند. برای این منظور در این مقاله ابتدا به بررسی تعاریف و اصطلاحاتی که بهکرات در مدیریت پروژه مورداستفاده قرار میگیرند پرداختهشده و سپس استانداردهای معتبر در این حوزه موردبررسی قرارگرفته و باهم مقایسه شدهاند تا بتوان مدیران پروژه ر...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computer Standards & Interfaces
دوره 50 شماره
صفحات -
تاریخ انتشار 2017