Methodology for Multi-stage, Operations- and Uncertainty-Aware Placement and Sizing of FACTS Devices in a Large Power Transmission System
نویسندگان
چکیده
We develop new optimization methodology for planning installation of Flexible Alternating Current Transmission System (FACTS) devices of the parallel and shunt types into large power transmission systems, which allows to delay or avoid installations of generally much more expensive power lines. Our methodology takes as an input projected economic development, expressed through a paced growth of the system loads, as well as uncertainties, expressed through multiple scenarios of the growth. We price new devices according to their capacities. Installation cost contributes to the optimization objective in combination with the cost of operations integrated over time and averaged over the scenarios. The multi-stage (-time-frame) optimization aims to achieve a gradual distribution of new resources in space and time. Constraints on the investment budget, or equivalently constraint on building capacity, is introduced at each time frame. Our approach adjusts operationally not only newly installed FACTS devices but also other already existing flexible degrees of freedom. This complex optimization problem is stated using the most general AC Power Flows. Non-linear, non-convex, multiple-scenario and multi-time-frame optimization is resolved via efficient heuristics, consisting of a sequence of alternating Linear Programmings or Quadratic Programmings (depending on the operational cost dependence on the power injected by the generators) and AC-PF solution steps designed to maintain operational feasibility for all scenarios. Computational scalability and other benefits of the newly developed approach are illustrated on the example of the 2736-nodes large Polish system. One most important advantage of the framework is that the optimal capacity of FACTS is build up gradually at each time frame in a limited number of locations, thus allowing to prepare the system better for possible congestion due to future economic and other uncertainties.
منابع مشابه
Optimal placement and sizing of distributed generation considering FACTS devices and load uncertainty using hybrid sine-cosine algorithm and particle swarm optimization (HSCA-PSO)
Using Distributed Generation (DG) in electrical distribution networks brings many advantages and thus, optimal placement and sizing of these units become important. Most of the researches in this field neglect the effect of transmission system on distribution section. These researches also ignore the effect of Flexible Alternating Current Transmission Systems (FACTS). This thesis proposes a new...
متن کاملOptimal Placement and Sizing of TCSC & SVC for Improvement Power System Operation using Crow Search Algorithm
Abstract: The need for more efficient power systems has prompted the use of a new technologies includes Flexible AC transmission system (FACTS) devices. FACTS devices provides new opportunity for controlling the line power flow and minimizing losses while maintaining the bus voltages within a permissible limit. In this thesis a new method is proposed for optimal placement and sizing of Thyristo...
متن کاملUPFC Siting and Sizing in Power Network Using Two Different Evolutionary Algorithm
In emerging electric power systems, increased transactions often lead to the situations where the system no longer remains in secure operating region. The flexible Ac transmission system (FACTS) controllers can play an important role in the power system security enhancement. However, due to high capital investment, it is necessary to locate these controllers optimally in the power system. FACTS...
متن کاملتعیین بهینه تولید و مکان و اندازه بهینه ادوات FACTS به منظور حذف تراکم خطوط
The application of Flexible AC Transmission System (FACTS) devices shows that they can control the power system technical parameters effectively. However, optimal placement and sizing of them are difficult problems and analytical methods cannot be used to solve these problems. To solve such problems, some evolutionary algorithms are employed. The efficiency of these algorithms is related to the...
متن کاملImprovement of Power System Condition by Placement of Flexible Alternating Current Transmission Systems devices
Flexible Alternating Current Transmission Systems (FACTS) devices have been used for several targets in power system, one of the main contributions of the devices is improving operation conditions. In this paper, two types of these devices have been placed to raise voltage profile, minimizing system loss and arising loadability. The suggested FACTS devices are: Unified Power Flow Controller (UP...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1707.03686 شماره
صفحات -
تاریخ انتشار 2017