Some Valid Inequalities for the Probabilistic Minimum Power Multicasting Problem
نویسندگان
چکیده
In this paper we describe some results on the linear integer programming formulation of the Probabilistic Minimum Power Multicast (PMPM) problem for wireless networks. The PMPM problem consists in optimally assigning transmission powers to the nodes of a given network in order to establish a multihop connection between a source node and a set of destination nodes. The nodes are subject to failure with some probability, however the assignment should be made so that the reliability of the connection is above a given threshold level. This model reflects the necessity of taking into account the uncertainty of hosts’ availability in a telecommunication network.
منابع مشابه
Minimum power multicasting in wireless networks under probabilistic node failures
In this paper we deal with a new probabilistic extension of the Minimum Power Multicast (MPM) problem for wireless networks. The deterministic MPM problem consists in assigning transmission powers to the nodes, so that a multihop connection can be established between a source and a given set of destination nodes and the total power required is minimized. We present a new extension to the basic ...
متن کاملA new approach for the minimum power broadcast problem in wireless networks
In this paper we consider the problem of assigning transmission powers to the nodes of a wireless network in such a way that all the nodes of the network are connected and the total power consumption is minimized. A mixed integer programming formulation is presented together with some new valid reinforcing inequalities. Computational results show the effectiveness of the new valid inequalities ...
متن کاملMILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags
In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We propose two mixed-integer linear programming (MILP) models and two types of valid inequalities which aim t...
متن کاملThe Reliable Hierarchical Location-allocation Model under Heterogeneous Probabilistic Disruptions
This paper presents a novel reliable hierarchical location-allocation model where facilities are subject to the risk of disruptions. Based on the relationship between various levels of system, a multi-level multi-flow hierarchy is considered. The heterogeneous probabilistic disruptions are investigated in which the constructed facilities have different site-dependent and independent failure rat...
متن کاملSOME PROBABILISTIC INEQUALITIES FOR FUZZY RANDOM VARIABLES
In this paper, the concepts of positive dependence and linearlypositive quadrant dependence are introduced for fuzzy random variables. Also,an inequality is obtained for partial sums of linearly positive quadrant depen-dent fuzzy random variables. Moreover, a weak law of large numbers is estab-lished for linearly positive quadrant dependent fuzzy random variables. Weextend some well known inequ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Electronic Notes in Discrete Mathematics
دوره 36 شماره
صفحات -
تاریخ انتشار 2010