Lead time control in multi-class multi-stage assembly systems with finite capacity
نویسندگان
چکیده
In this paper, we model multi-class multi-stage assembly systems with finite capacity as queueing networks. It is assumed that different classes (types) of products are produced by the production system and products’ orders for different classes are received according to independent Poisson processes. Each service station of the queueing network specifies a manufacturing or assembly operation, in that processing times for different types of products are independent and exponentially distributed random variables with service rates, which are controllable, and the queueing discipline is First Come First Served (FCFS). Different types of products may be different in their routing sequences of manufacturing and assembly operations. For modeling multi-class multi-stage assembly systems, we first consider every class separately and convert the queueing network of each class into an appropriate stochastic network. Then, by using the concept of continuous-time Markov processes, a system of differential equations is created to obtain the distribution function of manufacturing lead time for any type of product, which is actually the time between receiving the order and the delivery of finished product. Furthermore, we develop a multi-objective model with three conflicting objectives to optimally control the service rates, and use goal attainment method to solve a discrete-time approximation of the original multi-objective continuous-time problem. 2013 Elsevier Ltd. All rights reserved.
منابع مشابه
Multi-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)
In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...
متن کاملA queuing-location model for in multi-product supply chain with lead time under uncertainty
Supply chain network design (SCND) problem has recently been gaining attention because an integrated management of the supply chain (SC) can reduce the unexpected/undesirable events and can affect definitely the efficiency of all the chain. A critical component of the planning activities of a manufacturing firm is the efficient design of its SC. Hence, SCND affords a sensitive platform for effi...
متن کاملAssembly line balancing problem with skilled and unskilled workers: The advantages of considering multi-manned workstations
This paper address a special class of generalized assembly line balancing in which it is assumed that there are two groups of workers: skilled and unskilled ones. The skilled workers are hired permanently while the unskilled ones can be hired temporarily in order to meet the seasonal demands. It is also assumed that more than one worker may be assigned to each workstation. To show the adv...
متن کاملAdaptive Consensus Control for a Class of Non-affine MIMO Strict-Feedback Multi-Agent Systems with Time Delay
In this paper, the design of a distributed adaptive controller for a class of unknown non-affine MIMO strict-feedback multi agent systems with time delay has been performed under a directed graph. The controller design is based on dynamic surface control method. In the design process, radial basis function neural networks (RBFNNs) were employed to approximate the unknown nonlinear functions. S...
متن کاملA chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability
A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 66 شماره
صفحات -
تاریخ انتشار 2013