Equipment selection with heterogeneous fleets for multiple-period schedules

نویسندگان

  • Christina N. Burt
  • Lou Caccetta
  • P. Welgama
  • L. Fouché
چکیده

Abstract. In a simple surface mining scenario we can consider the mine to have one mining location and one dump-site connected by a lone truck route. Our objective is to determine a purchase and salvage policy for trucks and loaders such that the cost of materials handling is minimized over a multiple period schedule. This problem quickly becomes large scale when we consider large sets of possible trucks and loaders, and long schedules. The inclusion of pre-existing equipment leads to the possibility of heterogeneous fleets, and the non-uniform behaviour of different equipment types (with respect to operating cost, availability and productivity) coupled with compatibility issues adds to the complexity of the problem. In this paper, we present an integer program for equipment selection that incorporates heterogeneous fleets and pre-existing equipment while optimizing over multiple periods. We introduce a specialized linear constraint set to ensure satisfaction of production requirements while accounting for equipment compatibility. We also test the model on a truck and loader case study for surface mines. The resulting model is a robust equipment selection tool that obtains optimal solutions quickly for large sets of equipment and long schedules. Many aspects of the presented model, such as the consideration of multiple periods and pre-existing equipment, are novel for the mining industry and ensure that the model is both a new and advanced equipment selection tool.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An MILP approach to Multi-location, Multi-Period Equipment Selection for Surface Mining with Case Studies

In the surface mining industry, the Equipment Selection Problem involves choosing an appropriate fleet of trucks and loaders such that the long-term mine plan can be satisfied. An important characteristic for multi-location (multi-location and multi-dumpsite) mines is that the underlying problem is a multi-commodity flow problem. The problem is therefore at least as difficult as the fixed-charg...

متن کامل

Solving a Bi-Objective Multi-Product Vehicle Routing Problem with Heterogeneous Fleets under an Uncertainty Condition

This paper presents a novel bi-objective multi-product capacitated vehicle routing problem with uncertainty in demand of retailers and volume of products (UCVRP) and heterogeneous vehicle fleets. The first of two conflict fuzzy objective functions is to minimize the cost of the used vehicles, fuel consumption for full loaded vehicles and shortage of products. The second ...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

A Fuzzy Based Mathematical Model for Vendor Selection and Procurement Planning with Multiple Discounts in the Presence of Supply Uncertainty

Supplier selection and material procurement planning are the most important issues in supply chain management. This decision is complicated when the buyers face with discount price schemes. In real situation, each supplier may apply different methods such as different types of discount schedules and various types of payment in order to increase market share. In this situation, buyers try to sel...

متن کامل

Analysis of reliability and maintainability for multiple repairable units (Case study: Sungun copper mine)

The appropriate operating of mining machines is affected by both the executive and environmental factors. Considering the effects and the related risks lead to a better understanding of the failures of such machines. This leads to a proper prediction of the reliability parameters of such machines. In this research work, the reliability and maintainability analysis of the loading and haulage mac...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JORS

دوره 62  شماره 

صفحات  -

تاریخ انتشار 2011