Exploring the psychological factors involved in the Ladbroke Grove rail accident.
نویسندگان
چکیده
Ten years after the event and the question as to exactly why a driver passed a signal at danger to cause the Ladbroke Grove rail disaster is still an open one. This paper uses the literature on human error and cognition, combined with critical path analysis, to provide further insight. Five aspects of train operation are drawn out of the known facts surrounding the incident: custom and practice in the use of the Driver's Reminder Appliance, operation and use of the Automatic Warning System, the sequence of signalling information, methods of supplying route information, and speed restrictions. Associated with each are several important human factors issues which, combined, give rise to five potential explanations. Critical path analysis is used to map these explanations onto the known facts of the situation. It is suggested that the proximal cause of the Ladbroke Grove rail crash was a combination of an association-activation error and a mode error (leading the driver to mistakenly assume he had activated the Reminder Appliance) together with a loss-of-activation error (the driver failing to remember that a previous signal was showing caution) and a data-driven-activation error (by associating an in-cab warning to the wrong external source). The findings support the original inquiry recommendations, but also go further into predictive methods of detecting problems at the human/transport system interface.
منابع مشابه
Ergonomics – rok 2008 , ročník 51 Číslo 4
The purpose of the paper was to address the timeliness of the signaller's intervention in the Ladbroke Grove rail incident in the UK, as well as to consider the utility of human performance time modelling more generally. Human performance response time modelling is a critical area for Human Factors and Ergonomics research. This research applied two approaches to the same problem to see if they ...
متن کاملHSE: CRR 315 Valuation of benefits of health and safety control: Follow up study
This report summarises the findings of a follow-up study to the HSE/DETR/Home Office/HM Treasury Project 'relativities' study (HSE CRR 273/2000), which sought to elicit public preferences for preventing fatalities in several hazard contexts (railway/road accidents and public/home fires). The very public debate in the media and elsewhere regarding the organisation of rail safety following the La...
متن کاملA systems analysis of the Ladbroke Grove rail crash.
On 5 October 1999, near London Paddington Station, two trains collided on a main line near Ladbroke Grove. The immediate "human error" that preceded this crash was a Signal Passed At Danger (SPAD). Thirty-one people lost their lives and many more were injured. The crash prompted an extensive multi-disciplinary investigation and hearing to identify the factors that contributed to the Signal Pass...
متن کاملLessons for Policy Makers in Non-High Speed Rail Countries: A Review
High speed intercity passenger rail is an inherently strong railway application. It operates over 250 km/hour. For perspective, high-speed represents the ultimate development of preexisting standard gauge infrastructure. Network of high-speed passenger rail lines aimed at reducing accident, reducing traffic congestion, air pollution cutting national dependence on foreign oil and improving rural...
متن کاملبررسی حوادث حمل و نقل جاده ای مواد خطرناک در ایران
Background and aims: All over the world, and particularly in industrialized countries, the transport of hazardous materials has till years a continuously increasing trend. Public concern is focused mainly on road and rail transport, since the routes used for road and rail transportation of hazardous substances necessarily come closer and sometimes also cross densely populated areas. In this st...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Accident; analysis and prevention
دوره 43 3 شماره
صفحات -
تاریخ انتشار 2011