Understanding the Front-end of Large-scale Engineering Programs
نویسندگان
چکیده
Large engineering programs like sociotechnical infrastructure constructions of airports, plant constructions, or the development of radically innovative, high-tech industrial products such as electric vehicles or aircraft are affected by a number of serious risks, and subsequently commonly suffer from large cost overruns. Significant problems in program execution can be traced back to practices performed, or more frequently not performed, in the so-called “fuzzy front end” of the program. The lack of sufficient and effective efforts in the early stages of a program can result in unstable, unclear and incomplete requirements, unclear roles and responsibilities within the program organization, insufficient planning, and unproductive tensions between program management and systems engineering. This study intends to clarify the importance of up-front planning to improve program performance, to propose a model for the front-end of large-scale engineering programs based on a review of existing, suitable models in literature and to better understand the complexity drivers that are impeding reliable planning and common planning mistakes made in large-scale engineering
منابع مشابه
How Does Large-scale Wind Power Generation Affect Energy and Reserve Prices?
Intermittent nature of wind power faced ISO and power producers with new challenges. Wind power uncertainty has increased the required reserve capacity and deployment reserve. Consequently, large-scale wind power generation increases ISO costs and consequently reserve prices. On the other hand, since wind power producers are price taker, large-scale wind power generation decreases residual dema...
متن کاملImplementation of Low-Cost Architecture for Control an Active Front End Rectifier
In AC-DC power conversion, active front end rectifiers offer several advantages over diode rectifiers such as bidirectional power flow capability, sinusoidal input currents and controllable power factor. A digital finite control set model predictive controller based on fixed-point computations of an active front end rectifier with unity displacement of input voltage and current to improve dynam...
متن کاملA Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects
Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...
متن کاملAssessment and Design Enhancement of the Front End Energy Absorption Mechanism of a Locomotive Based on an Impact Scenario
This research is concerned with weighing the behavior of the front end energy absorption system of a locally manufactured locomotive in crash situations. The causes of the extensive damages to the energy absorption apparatus that includes the crash element and the buffer are studied. By choosing the proper damage model the conditions of the accident is simulated by using the ABAQUS engineering ...
متن کاملCOMPUTATIONALLY EFFICIENT OPTIMUM DESIGN OF LARGE SCALE STEEL FRAMES
Computational cost of metaheuristic based optimum design algorithms grows excessively with structure size. This results in computational inefficiency of modern metaheuristic algorithms in tackling optimum design problems of large scale structural systems. This paper attempts to provide a computationally efficient optimization tool for optimum design of large scale steel frame structures to AISC...
متن کامل