DOE: Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets
نویسندگان
چکیده
THIS DOCUMENT. The following utilities/RTOs provided tremendous support to the project including provision of system data, review and feedback on models, review and feedback on analytical and simulation results, and review and feedback on project reports: Entergy Corporation Oglethorpe Power Company Southern Company Southwest Power Pool Tennessee Valley Authority It is noted that that the active engagement and participation of these companies does not indicate endorsement of all results presented. While numerous staff participated from some of these organizations, we would like to especially thank the following individuals for their participation and leadership throughout the project: In addition, Stan Hadley also provided valuable insights to the project team through separate funding from the Department of Energy. iv EXECUTIVE SUMMARY This DOE-funded project titled " Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets " aims to evaluate the benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of different balancing approaches with increasing levels of interregional cooperation. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the western regions of SERC. The study evaluates the scheduling/balancing challenges associated with delivery of sufficient wind generation from within the SPP footprint to support 20% energy from renewable resources across the SPP, Entergy (EES), Southern Company (SoCo), and the Tennessee Valley Authority (TVA) balancing areas for the year 2022. The project team worked closely with staff from each of these companies to develop a model of the possible generation fleets within each BA. Based on the 2022 generation plans identified, specific wind generation sites within the SPP footprint were identified to yield sufficient energy output to allow each of the 4 BAs to meet the net renewable energy requirement beyond the renewable energy from the base generation fleet. As the effort required for transmission planning for increased amounts of wind was outside the scope of the project, transmission constraints were ignored and a transportation model was used. The Eastern Interconnect wind generation data set developed by the National Renewable Energy Laboratory (NREL) was utilized for identifying specific wind plants with SPP for both internal SPP consumption and for delivery to the SERC BAs. The primary analyses …
منابع مشابه
Assessment of Wind Energy Use to Store the Water for Generation Power with Two Stage Optimization Method
In recent years, energy predicament and environmental problems in the world caused by fossil fuels combustion make us to pay serious attention to optimizing energy consumption and using renewable energies. One of the potential renewable energies which can be helpful in electricity generation is harness wind and water energy or using these two kinds of energy simultaneously. In this study, to pr...
متن کاملEffects of Wind Power plants on Energy Price and Power Systems Reliability in Imperfect Competition Electricity Market
The benefits of wind power generation have led to an ever-increasing expansion of wind farms around the world. The low cost of production and the environmental benefits of wind farms are some of the main reasons for using wind energy. On the other hand, uncertainty costs in the production and control of the output of wind turbines are among the problems that are being encountered for electricit...
متن کاملOptimal Decision Making Framework of an Electric Vehicle Aggregator in Future and Pool markets
Electric vehicle (EV) aggregator, as an agent between the electricity market and EV owners, participates in the future and pool market to supply EVs’ requirement. Because of the uncertain nature of pool prices and EVs’ behaviour, this paper proposed a two-stage scenario-based model to obtain optimal decision making of an EV aggregator. To deal with mentioned uncertainties, the aggregator’s risk...
متن کاملLarge scale wind power integration challenges
In the scenario of energy and environmental crises that we are facing today, integrating renewable sources of energy with the existing power grids is rapidly becoming the most obvious solution. Harnessing electricity from wind is a promising option that has lately attracted attention and research funding worldwide. However, increasing wind power penetration still remains a daunting problem star...
متن کاملMulti Objective Scheduling of Utility-scale Energy Storages and Demand Response Programs Portfolio for Grid Integration of Wind Power
Increasing the penetration of variable wind generation in power systems has created some new challenges in the power system operation. In such a situation, the inclusion of flexible resources which have the potential of facilitating wind power integration is necessary. Demand response (DR) programs and emerging utility-scale energy storages (ESs) are known as two powerful flexible tools that ca...
متن کامل