ECONOMICS OF FBR FUEL CYCLE S.Govindarajan Core Engineering and Component Handling Division,

نویسنده

  • Indira Gandhi
چکیده

Fuel cycle cost of a fast reactor is expected to play an important role of compensating for higher capital cost of a Fast Reactor and keeping the unit energy cost competitive. PFBR fuel cycle cost has been worked out by a committee constituted for the purpose. The cost has been worked out for a peak fuel burn-up of 1,00,000 MWd/t. The basic components of the PFBR fuel cycle are fabrication cost, storage cost, reprocessing cost and waste management cost. Plutonium and depleted uranium are assumed to be available free of cost. Transport cost has been neglected since the entire fuel cycle facility is co-located at reactor site. Waste management cost till interim storage is accounted. The fuel cycle cost is estimated as 94 paise /kWh at 2009 prices. This cost constitutes roughly 25% of the unit energy cost. Measures to reduce the fuel cycle cost are discussed in the paper. These include integrating all fuel cycle facilities to effect savings in capital as well as revenue expenditures and increasing fuel burn-up. Costs that have not been considered are decommissioning costs of the fuel cycle facilities and cost of deep geological waste repository. It is suggested that the waste disposal costs should be borne by all nuclear power plants by levying a few paise for every unit of nuclear electricity generated.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Conventional and Advanced Exergetic and Exergoeconomic Analysis of an IRSOFC-GT-ORC Hybrid System

Due to the necessity of using highly efficient power generation systems to reduce fuel consumption and air pollution, the integration of different energy systems is promising modification to achieve higher efficiency. In this paper, the integration of an Internal Reforming Solid Oxide Fuel Cell (IRSOFC)-Gas Turbine (GT)-Organic Rankine Cycle (ORC) system has been proposed. In this regard, therm...

متن کامل

Core Loading Design for Bushehr Pressurized Water Reactor

The modified out-in fuel management strategy was applied to the core loading design for the first four cycles of the Bushehr (Iran-1) KWU designed Pressurized Water Reactor (PWR). The minimum peak-to-average power density was chosen as the objective function of the optimization process. Lattice homogenization and group constants generation were performed by using the LEOPARD computer code. For ...

متن کامل

Mass Balance of the Pu and Minor Actinides Recycling Metal Fuel System

The mass flow of Plutonium and minor actinides is calculated for a future LWR-FBR fuel cycle model, in which a certain scale of power generation by LWRs is continued for a long period before the replacement by FBRs begins. The burnup of the LWR spent fuel is considered to be higher than the current standard. It is assumed that all the Plutonium and minor actinides recovered from LWRs are kept a...

متن کامل

Analysis of Mass Flow and Cost for Double - Strata Fuel Cycle

In this study, the mass flow in double-strata nuclear fuel cycle is analysed based on mass inventory balance model, and the cost evaluation is carried out. As the commercial reactor fuel cycle, which is assumed to be sustainable in a significantly long term, the following different reactors and fuel cycles are considered: (1) Scheme of light water reactor (LWR-UOX and -MOX) based on sea water u...

متن کامل

Investigation of Dual Fuel Diesel Engine With Particular Reference to Engine Cycle Model

In order to use gaseous fuels in Diesel Engines, Dual-Fuel Diesel Engine (D. F. D. E) the pilot injection approach is chosen. To predict its performance, an engine cycle model, based on limited-pressure Diesel cycle, is constructed. The model predicts D. F. D. E performance with LPG, and CNG gases. Comparing with pure Diesel engine, by increasing gas proportion in dual-fuel, indicated power and...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003