Evaluation of Factors affecting the Quality of Construction Projects
نویسندگان
چکیده
Quality is one of the important aspects of all projects. The level of success of construction projects greatly depends on the quality performance. The Pakistan construction sector is facing quality related issues, which lead to ineffective and inefficient projects in terms of cost of overrun, delays and excessive rework. This research is carried out to scrutinize the factors, that have triumphed and adverse effect on the construction projects. A questionnaire was developed based on identified factors to take opinion of construction experts. After their feedback a statistical analysis tool such as chisquare and weighted mean method (WMM) were used to rank the significance level of these factors. Key words-Quality, Construction projects, Pakistan, Internal factors, External factors, Chi-Square, Weighted Mean Method
منابع مشابه
The construction projects HSE performance evaluation considering the effect of external factors using Choquet integral, case study (an Iranian power plant construction company)
Nowadays, industrialization exposes the human and environment resources to serious dangers. The importance of these resources caused the HSE (health, safety and environment) to have a significant contribution in industries’ evaluation, especially in construction industry. While evaluating the project’s success from an HSE point of view, it is not enough to rely solely on the outputs without con...
متن کاملAssessment criteria and factors affecting the success of Public-Private Partnership (PPPs) in urban construction projects with an emphasis on Factor analysis and Pareto analysis
In the present study, criteria and factors affecting the success of public-private partnership in urban construction projects was examined relying on the combined method (analytical and correlation). In the method, based on the literature and document review and subsequent utilizes a field study (case study, interviews with experts and distributed questionnaires) was an attempt to explore the r...
متن کاملFactor Analysis of Risk Variables Affecting Occupational Injuries: A Field Study in Construction Projects
Background and Objective: Approximately, half of the occupational accidents are associated with the construction industry in Iran. Therefore, the factor analysis of risk variables affecting occupational injuries in the construction industry can lead to understanding and reducing the rate of injuries in these projects. The purpose of this study was to identify the risk factors affecting the type...
متن کاملبررسی عوامل مؤثر بر تفاوت مبلغ برآورد اولیه با قیمت تمام شده پروژههای عمرانی(مطالعه موردی: شهرداری شیراز)
Actual (Final) price of construction projects are usually deviations compared to their initial estimates. At runtime, these projects face increasing in costs for various reasons and may lose their economic justification. Therefore, identifying factors affecting this price difference are one of the most important issues in this field. This study identifies the importance of the factors affecting...
متن کاملDEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY
Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...
متن کامل