Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, �96�; Fulkerson, �96�; Kelley & Walker, �959; PMI, ���6; Pritsker, �966), which can be widely applied to project planning fromareas as diverse as construction and R&D. However, these network planning methods are not very appropriate in cases where IT, innovation or product development are involved. There are some shortcomings when using network planning methods for scheduling these kinds of projects, because these methods cannot handle the importance of the task realizations. They cannot solve the problem, when some tasks have to be left out from the project because of the constraints, or when the completion order of tasks can be different. In this paper new matrix-based project planning methods are introduced which illustrate how all possible solutions can be determined in two steps based on the Project Expert Matrix. Firstly those tasks are selected, which have to be or can be realized during the project. Afterwards the dependencies (the sequence of the chosen tasks) are determined taking the project constraints into account. The possible solutions can be ranked and the most probable solution can be chosen which can be realized within the given constraints. This method can be a useful tool for project managers as a part of an expert system. Key words�� matrix-based project planning method, Project Expert Graph, Project Expert Matrix, Stochastic Network Planning Method.
منابع مشابه
Development of a Generic Risk Matrix to Manage Project Risks
A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...
متن کاملChalleNgeS of the ProjeCt PlaNNINg MethodS IN the 21St CeNtury
There are a lot of project planning (like Gantt chart (Gant, 1910)) and network-based scheduling methods (like CPM, PDM, GERT (see i.e. Kelley-Walker, 1959, Pritsker 1966)), they were developed for handling traditional (e.g. construction) projects. While these methods are appropriate for the operation level logic planning, scheduling, cost and resource allocation of traditional project manageme...
متن کاملAn Integrated Human Resource Planning Framework for Project-based Organizations in Oil and Gas Industry
The complexities of the oil industry, combined project-based organizations’ complexities, have led the traditional planning of HR being failed. The success of these organizations is based on integrative human resource planning. To this end, the purpose of this study was to determine the factors and components of human resource planning in oil and gas project-based organizations and providing an...
متن کاملA Grey-Based Fuzzy ELECTRE Model for Project Selection
Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...
متن کاملSoftware Project Planning and Resource Allocation Using Ant Colony Optimization with Uncertainty Handling
In software engineering field, developing software tools is challenging and important. In software project humans are important. Human resources are mainly needed. In software project, planning is important. Since software project is much related to human resource, the human resource allocation is the important problem. A software project planning tool must consider the project planning as well...