This paper considers the scheduling of n jobs on m parallel machines to minimize the weighted number of early and tardy jobs. The single machine case of this problem has been shown to be NPcomplete in the strong sense. This problem on m parallel machine is also NP complete in the strong sense and finding an optimal solution appears unlikely. The problem is formulated as an integer linear programming model. In this paper, we propose some meta-heuristics for solving this problem. Extensive computational experiments were performed which gave promising results.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem

In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery.  jobs have to be scheduled on a single machine and delivered to  customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...

متن کامل

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

A Survey of Single Machine Scheduling to Minimize Weighted Number of Tardy Jobs

This paper presents a review of single machine scheduling to minimize the weighted number of tardy jobs. The problem involves processing n jobs on a single machine, each having processing time pj and due date dj . The aim is to schedule the jobs to meet their due date. A job is tardy if the completion time of job j is Cj > dj and on-time otherwise. This paper assesses works done to minimize the...

متن کامل

Artificial Immune System for Single Machine Scheduling and Batching Problem in Supply Chain

This paper addresses a production and outbound distribution scheduling problem in which a set of jobs have to be process on a single machine for delivery to customers or to other machines for further processing. We assume that there is a sufficient number of vehicles and the delivery costs is independent of batch size but it is dependent on each trip. In this paper, we present an Artificial Imm...

متن کامل

حل مسئله زمان بندی ماشینهای موازی نامرتبط با اهداف کل زودکرد وزنی و کل دیرکرد وزنی با استفاده از الگوریتم جستجوی پراکنده چند هدفه

The parallel machine scheduling problem is an important and difficult problem to be considered in the real-world situations. Traditionally, this problem consists of the scheduling of a set of independent jobs on parallel machines with the aim of minimizing the maximum job completion. In today's manufacturing systems, in which both early and tardy finishing of job processing are undesired, the o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012