Stable laws and the present value of fixed cash-flows

نویسندگان

  • Marc Goovaerts
  • Ann De Schepper
  • David Vyncke
  • Jan Dhaene
  • Rob Kaas
چکیده

In the current contribution, we consider the present value of a series of fixed cash flows under stochastic interest rates. In order to model these interest rates, we don’t use the common lognormal model, but stable laws, which better fit in with reality. For this present value, we want to derive a result about the distribution function. However, due to the dependencies between successive discounted payments, the calculation of an exact analytical distribution for the present value is impossible. Therefore, use is made of the methodology of comonotonic variables and the convex ordering of risks, introduced by the same authors in some previous papers. The present paper starts with a brief overview of properties and qualities of stable laws, and of the possible application of the concept of convex ordering to sums of risks which is also the situation for a present value of future payments. Afterwards, it is shown how for the present value under investigation an approximation in the form of a convex upper bound can be derived. This upper bound has an easier structure than the original present value, and we derive elegant calculation formulas for the distribution of this bound. Finally, we provide some numerical examples, which illustrate the precision of the approximation. Due to the design of the present value and due to the construction of the upper bound, these illustrations show great promise concerning the accuracy of the approximation. JEL Classification : C10, C63, E43.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource Investment Problem With Discounted Cash Flows

A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered decision variables and the goal is to find a schedule and resource requirement levels such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash flows. ...

متن کامل

Net Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems

While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...

متن کامل

Net Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems

While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...

متن کامل

Resource Investment Problem with Discounted Cash Flows

A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered as decision variables and the goal is to find a schedule, and resource requirement levels, such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash fl...

متن کامل

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003