Heuristics and augmented neural networks for task scheduling with non-identical machines
نویسندگان
چکیده
We propose new heuristics along with an augmented-neural-network (AugNN) formulation for solving the makespan minimization task-scheduling problem for the non-identical machine environment. We explore four task and three machine-priority rules, resulting in 12 combinations of single-pass heuristics. The task-priority rules are Highest-LevelFirst (HLF), Highest-Total-Remaining-Processing-Time-First (HTRPTF), Smallest-Latest-Finish-Time-First (SLFTF) and Minimum-Slack-First (MSF). For machine priority, we propose a greedy rule called Fastest-Available-MachineFirst (FAMF), and two non-greedy rules: (1) Fastest-Available-Machine-First-With-Conditional-Wait-1 (FAMFCW-1), and (2) Fastest-Available-Machine-First-With-Conditional-Wait-2 (FMF-CW-2). The AugNN approach integrates neural-network learning with domain and problem specific knowledge through heuristics, to produce good results. A single-pass heuristic is embedded in a neural network designed specifically for each problem. We give the AugNN formulation for each of the 12 heuristics and show computational results on 100 randomly generated problems of sizes ranging from 20 to 70 tasks and 2 to 5 machines. Results demonstrate that AugNN provides significant improvement over single-pass heuristics. The reduction in the gap between the obtained solution and the lower-bound due to AugNN over single-pass heuristics ranged from 24.4% to 50%. As far as heuristics, the non-greedy machine-priority rules performed significantly better than the greedy rule. The average gaps for the non-greedy rules ranged from 16.1% to 23.5% compared to 33.7% to 40.4% for greedy. For AugNN, for non-greedy rules, the gap ranged from 11.5% to 15.5% compared to 18.4% to 25.0% for greedy. The HLF and HTRPTF task priority rules performed better than the other two. The HTRPTF/FAMF-CW-1 combination gave the best results, closely followed by HLF/FAMF-CW-2 and HTRPTF/FAMF-CW-2 combinations. 2005 Elsevier B.V. All rights reserved. 0377-2217/$ see front matter 2005 Elsevier B.V. All rights reserved. doi:10.1016/j.ejor.2005.03.045 * Corresponding author. Tel.: +1 3523927300; fax: +1 3523925438. E-mail addresses: [email protected] (A. Agarwal), [email protected] (S. Colak), [email protected] (V.S. Jacob), [email protected] (H. Pirkul). A. Agarwal et al. / European Journal of Operational Research 175 (2006) 296–317 297
منابع مشابه
Augmented neural networks for task scheduling
We propose a new approach, called Augmented Neural Networks (AugNN) for solving the task-scheduling problem. This approach is a hybrid of the heuristic and the neural networks approaches. While retaining all the advantages of the heuristic approach, AugNN incorporates learning, to find improved solutions iteratively. This new framework maps the problem structure to a neural network and utilizes...
متن کاملNon-Greedy Heuristics and Augmented Neural Networks for the Open-Shop Scheduling Problem
In this paper we propose some non-greedy heuristics and develop an Augmented-Neural-Network (AugNN) formulation for solving the classical open-shop scheduling problem (OSSP). AugNN is a neural network based meta-heuristic approach that allows integration of domain-specific knowledge. The OSSP is framed as a neural network with multiple layers of jobs and machines. Input, output and activation f...
متن کاملA bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملOnline Scheduling of Jobs for D-benevolent instances On Identical Machines
We consider online scheduling of jobs with specic release time on m identical machines. Each job has a weight and a size; the goal is maximizing total weight of completed jobs. At release time of a job it must immediately be scheduled on a machine or it will be rejected. It is also allowed during execution of a job to preempt it; however, it will be lost and only weight of completed jobs contri...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 175 شماره
صفحات -
تاریخ انتشار 2006