Optimization of Insuring Critical Path Problem with Uncertain Activity Duration Times

نویسندگان

  • Zhenhong Li
  • Xiaodong Dai
چکیده

In fuzzy decision systems, we model insuring critical path problem by two-stage risk-aversion fuzzy programming. For the proposed two-stage insuring critical path problem, we first define three solution concepts, expected value solution, wait-and-see solution and here-and-now solution, then introduce the value of perfect information of value-at-risk (VaRVPI) and the value of the fuzzy solution of value-at-risk (VaRVFS). When activity duration times are continuous fuzzy variables, we adopt fuzzy simulation to turn the original insuring critical path problem into its approximate optimization problem. After that, we solve the approximate insuring critical path problem by hybrid algorithm, which combines dynamic programming method and genetic algorithm (GA). Finally, we report some computational results to illustrate the credibility of the developed modeling idea and the effectiveness of the designed algorithm. c ⃝2013 World Academic Press, UK. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of critical paths in a project network with random fuzzy activity times

Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...

متن کامل

Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths

I this paper, we consider a class of two-stage stochastic optimization problems arising in the protection of vital arcs in a critical path network. A project is completed after a series of dependent tasks are all finished. We analyze a problem in which task finishing times are uncertain but can be insured a priori to mitigate potential delays. A decision maker must trade off costs incurred in i...

متن کامل

الگوریتم جدیدی برای تحلیل حساسیت مسیر بحرانی در شبکه های پرت با درنظر گرفتن ریسک های موجود در پروژه

Taking into account, the uncertain time duration for each activity in a pert network, we would need to accept the notion that the critical path of the project could also vary a number of times during its execution. If these variations take place frequently during the project in an unpredictable manner, it could endanger the efficient management of that project, and in addition to lengthening th...

متن کامل

A new probability model for insuring critical path problem with heuristic algorithm

In order to obtain an adequate description of risk aversion for insuring critical path problem, this paper develops a new class of two-stage minimum risk problems. The first-stage objective function is to minimize the probability of total costs exceeding a predetermined threshold value, while the secondstage objective function is to maximize the insured task durations. For general task duration...

متن کامل

An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks

  We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013