Reengineering Production Systems: the Royal Netherlands Naval Dockyard

نویسنده

  • W. H. M. Zijm
چکیده

Reengineering production systems in an attempt to meet tight cost, quality and leadtime standards has received considerable attention in the last decade. In this paper, we discuss the reengineering process at the Royal Netherlands Naval Dockyard. The process starts with a characterisation and a careful analysis of the production system and the set of objectives to be pursued. Next, a new production management structure is defined after which supporting planning and control systems are designed and a number of organisational changes are carried through. In this way, the Dockyard may combine high technological capabilities with an excellent logistic performance.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Commentary on "some observations on an epidemic of sand-fly fever, occurring in one of HM ships". 1918.

The ship in which I am serving recently underwent a refit at an East Indian port; owing to the unhealthy locality of the dockyard, the officers and men were accommodated ashore during the period of repairs, which was of nearly two months’ duration (August 9 to October 5), one watch being quartered in the local Sailors’ Home in order to assist with the work on the ship whilst the other was sent ...

متن کامل

‘As His was Not a Surgical Case it was Not My Duty to Attend Him’: The Surgeon’s Role in the Nineteenth-Century Royal Dockyards

Despite a varied historical literature on the nineteenthcentury royal dockyards, very little has been written about the health issues associated with naval shipbuilding or the healthcare facilities that were provided for dockworkers in the period. This article focuses mainly on the latter. Drawing on archival sources from the home dockyards, an examination is made of the duties and responsibili...

متن کامل

Correlation between fibre content of the lungs and disease in naval dockyard workers.

In the period 1966-82 lungs from 333 workers who had been employed at a Royal Naval dockyard were referred to the MRC Pneumoconiosis Unit where they were investigated for the severity of asbestosis, the presence of tumours, and an assessment of mineral fibre content and the type and amount of mineral present. The occupational exposure to mineral dust has been coded for 189 of these cases. There...

متن کامل

The rise and fall in incidence of malignant mesothelioma from a British Naval Dockyard, 1979-1999.

BACKGROUND The incidence of malignant mesothelioma in Britain is predicted to rise over the next 15-25 years because of past failure to protect the workforce against inhalation of asbestos. In British Naval dockyards, alternative insulation materials and respiratory protection were introduced from the mid-1960s. Aims This study was carried out to investigate the effects of these control measure...

متن کامل

Strategic human resource allocation for an internal labor market: a human resource forecasting model for the Royal Netherlands Navy

Every organization needs a staff appropriate for its tasks in order to accomplish its business objectives, both now and in the future. To gain insight into the quality and number of staff needed in the future, human resource forecasting models are being used. This chapter addresses the design of a simulation model for human resources forecasting, which is being developed for the Chief of Naval ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007