Developing an Agent-Based Simulation System for Post-Earthquake Operations in Uncertainty Conditions: A Proposed Method for Collaboration among Agents
نویسندگان
چکیده
Agent-based modeling is a promising approach for developing simulation tools for natural hazards in different areas, such as during urban search and rescue (USAR) operations. The present study aimed to develop a dynamic agent-based simulation model in post-earthquake USAR operations using geospatial information system and multi agent systems (GIS and MASs, respectively). We also propose an approach for dynamic task allocation and establishing collaboration among agents based on contract net protocol (CNP) and interval-based Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) methods, which consider uncertainty in natural hazards information during agents’ decision-making. The decision-making weights were calculated by analytic hierarchy process (AHP). In order to implement the system, earthquake environment was simulated and the damage of the buildings and a number of injuries were calculated in Tehran’s District 3: 23%, 37%, 24% and 16% of buildings were in slight, moderate, extensive and completely vulnerable classes, respectively. The number of injured persons was calculated to be 17,238. Numerical results in 27 scenarios showed that the proposed method is more accurate than the CNP method in the terms of USAR operational time (at least 13% decrease) and the number of human fatalities (at least 9% decrease). In interval uncertainty analysis of our proposed simulated system, the lower and upper bounds of uncertain responses are evaluated. The overall results showed that considering uncertainty in task allocation can be a highly advantageous in the disaster environment. Such systems can be used to manage and prepare for natural hazards.
منابع مشابه
Robust Agent Based Distribution System Restoration with Uncertainty in Loads in Smart Grids
This paper presents a comprehensive robust distributed intelligent control for optimum self-healing activities in smart distribution systems considering the uncertainty in loads. The presented agent based framework obviates the requirements for a central control method and improves the reliability of the self-healing mechanism. Agents possess three characteristics including local views, decentr...
متن کاملA multi agent method for cell formation with uncertain situation, based on information theory
This paper assumes the cell formation problem as a distributed decision network. It proposes an approach based on application and extension of information theory concepts, in order to analyze informational complexity in an agent- based system, due to interdependence between agents. Based on this approach, new quantitative concepts and definitions are proposed in order to measure the amount of t...
متن کاملA multi Agent System Based on Modified Shifting Bottleneck and Search Techniques for Job Shop Scheduling Problems
This paper presents a multi agent system for the job shop scheduling problems. The proposed system consists of initial scheduling agent, search agents, and schedule management agent. In initial scheduling agent, a modified Shifting Bottleneck is proposed. That is, an effective heuristic approach and can generate a good solution in a low computational effort. In search agents, a hybrid search ap...
متن کاملAdaptive Neural Network Method for Consensus Tracking of High-Order Mimo Nonlinear Multi-Agent Systems
This paper is concerned with the consensus tracking problem of high order MIMO nonlinear multi-agent systems. The agents must follow a leader node in presence of unknown dynamics and uncertain external disturbances. The communication network topology of agents is assumed to be a fixed undirected graph. A distributed adaptive control method is proposed to solve the consensus problem utilizing re...
متن کاملDeveloping Robust Project Scheduling Methods for Uncertain Parameters
A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- ISPRS Int. J. Geo-Information
دوره 7 شماره
صفحات -
تاریخ انتشار 2018