Improved RMS for the PC environment
نویسندگان
چکیده
منابع مشابه
Clinical outcomes of corneal vertex versus central pupil references with aberration-free ablation strategies and LASIK.
PURPOSE To compare the clinical outcomes of aberration-free ablation profiles based on the normal corneal vertex (CV) and the pupil center (PC) in relation to laser in situ keratomileusis. Aberration-free aspheric ablation treatments were performed in all cases. METHODS Two myopic astigmatism groups (CV centered using the offset between pupil center and normal corneal vertex and PC centered u...
متن کاملWake Fields in a mm - Wave Linac
We estimate the short-range wake elds in the W-band active matrix linac of a 5-TeV collider, and demonstrate that for the assumed 60-pC bunch c harge and 10-m rms bunch length they are acceptable. Abstract. We estimate the short-range wake elds in the W-band active matrix linac of a 5-TeV collider, and demonstrate that for the assumed 60-pC bunch c harge and 10-m rms bunch length they are accep...
متن کاملComparison of upper limb muscle activity in four walking canes: a preliminary study.
It is hypothesized that the cane and forearm can be aligned to reduce muscular activity needed during ambulation. In this prospective study, 10 nonimpaired control subjects were tested both in stationary and dynamic weight-bearing states while using different cane prototypes and the platform cane (PC) as compared to the standard cane (SC). The outcome measures were: 1) root mean square (RMS) vo...
متن کاملQuantitative analysis of PC MRI velocity maps: pulsatile flow in cylindrical vessels.
The accuracy of MR phase contrast (PC) velocity mapping, and the subsequent derivation of wall shear stress (WSS) values, has been quantitatively assessed. Using a retrospectively gated PC gradient-echo technique, the temporal-spatial velocity fields were measured for pulsatile flow in a rigid cylindrical vessel. The experimental data were compared with values derived from the Womersley solutio...
متن کاملMinimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Microprocessors and Microsystems - Embedded Hardware Design
دوره 19 شماره
صفحات -
تاریخ انتشار 1995