Access to the Upper Forest Canopy with a Large Tower Crane Sampling the treetops in three dimensions

نویسندگان

  • Geoffrey G. Parker
  • Alan P. Smith
  • Kevin P. Hogan
چکیده

Figure 1. Sketch of the canopy crane operating in a forest showing the tower (a), jib (b), counterjib and counterweight (c), the operator's cab (d), and the gondola (e) attached to the hook. The radius and height of the jib are 82 and 52 m, respectively. T he uppermost forest canopy is a frontier ofscientific research (Erwin 1983). It is the primary interface between the atmosphere and the forest and is a reservoir of biological diversity. But understanding of this important portion of the forest is far from adequate because of the difficulties in gaining access to the tops of trees. Most techniques currently available to study canopies provide limited flexibility and maneuverability, little safety, and almost no access to the important outermost canopy zone. The inability to study the functioning of the upper forest canopy in situ has stalled progress on a variety of critical research pursuits. For example, the examination of forest/atmosphere interactions (crucial to understanding global climate) and rigorous analyses of canopy biodiversity (an essential basis for conservation decisions) are both severely limited by the lack of controlled canopy access. A tower crane with a long horizontal jib brings the previously unreachable portions of forests within the range of scientific scrutiny. It allows repeatable observations and experimental manipulations on individual

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The effect of ecophysiography on the quantitative characteristics of DBH, height, basal area, crown diameter and canopy area of trees in mountain forest communities (Case study: Oak-hornbeam community in Arasbaran forest)

Ecophysiography is the geography of the earth and the relationship between physiography and the ecosystem. Ecophysiography is a basis for planning processes to study the characteristics of terrestrial systems concerning the interactions between terrestrial physiography and living organisms. Due to the current state of ecosystems and the increase in natural disasters for ecosystem sustainability...

متن کامل

TOWER CRANES AND SUPPLY POINTS LOCATING PROBLEM USING CBO, ECBO, AND VPS

Tower cranes are major and expensive equipment that are extensively used at building construction projects and harbors for lifting heavy objects to demand points. The tower crane locating problem to position a tower crane and supply points in a building construction site for supplying all requests in minimum time, has been raised from more than twenty years ago. This problem has already been so...

متن کامل

Determination of suitable sampling methods for study of canopy cover in the Oak Forest

To detection of suitable sampling method to study tree canopy cover in the northern Zagros forest, Baneeh region forest, Kurdistan province, and west of Iran was selected. 40 square sample plots one hectare (100×100 m) were selected and perfect inventoried. In every sample plot the position of tree, kind of species and two diameter of crown (m) were recorded. To study of canopy cover different ...

متن کامل

Canopy gaps characteristics and structural dynamics in a natural unmanaged oriental beech (Fagus orientalis Lipsky) stand in the north of Iran

Canopy gaps are one of the most important structural features of forest ecosystems, and studying of them can have useful results and implications for forest management. The aim of this study is investigation of characteristics and regeneration within canopy gaps in an intact beech stand in the Shastkalateh Experimental Forest of Hyrcanian region, north of Iran. All canopy gaps and related fores...

متن کامل

Identification and assessment of human errors among tower crane operators using SHERPA and CREAM techniques

Introduction: Cranes are of the major causes of accidents in the construction industries. As human error mostly causes crane accidents, this study aims to investigate the human errors of tower crane operators in the construction projects using SHERPA and CREAM techniques. Material and Method: In this research, first, all of the tasks of the tower crane operator were identified and analyzed. Th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006