Exact Construction of Liu Process
نویسندگان
چکیده
Credibility measure was created by Baoding Liu [5, 7] and his Chinese co workers [4] around 2004. Then, Baoding Liu designed a grand view of fuzzy process, hybrid process and uncertain process [6]. In response to his work, Dai [1] sketched how to create standard normal fuzzy process under credibility measure, which he called standard Liu process. Independently Kageyama and Iwamura [3] constructed discrete time credibilistic processes and studied some convergences of the processes. Then, Iwamura and Kageyama [2] showed the existence of fuzzy process called standard Liu process with non decreasing sample paths. In this paper, we show how to mathematically create Liu process. In section 2, we give preliminary facts on credibility measure, fuzzy process, Liu process and credibility extension theorem. In section 3, we state how to create standard Liu process. In section 4, we state how to create Liu process.
منابع مشابه
Identification and Analysis of Metro Foundation Construction Safety Risk Based on Fault Tree Analysis
Fuzzy theory and Bayesian network theory were based on the fault tree. The fault tree analysis method improved the fault analysis to obtain number of event's exact problem. Considering the characteristics of the fuzzy risk analysis at the same time, it also solved the problem of scale fault analysis modeling. The theory is applied to the cost of construction shield tunnel risk analysis, floatin...
متن کاملChange Management and Change Process Model for the Iranian Construction Industry
Changes are inevitable in construction projects. They could lead to disruptive impacts on the quality, schedule and budget of projects. Identifying changes and anticipating their consequences can help project teams mitigate these negative impacts. As a result, a change process model has been defined to improve this procedure. At first the present paper the defines some of the key terms in this ...
متن کاملTunnel design and construction process in difficult ground conditions with Analysis of Controlled Deformations (ADECO) approach; a Case Study
The 10.6 km long Sabzkuh water conveyance tunnel is currently under construction in High Zagros structural zone, located in western Iran, has used conventional (in section T1) and mechanized (in section T2) methods. The section T1 of the tunnel driven through alluvial geological units with great complexity in an area high potential for sliding and water-bearing fault which has made the excavati...
متن کاملDesign and construction of a helium purification system using cryogenic adsorption process
One of the most appropriate methods for elimination of trace impurities in helium is cryogenic adsorption process. So, in this study design and construction of cryogenic adsorption helium purification system (3 Nm3.hr-1, 80 bar) carried out using activated carbon as adsorbent at 77K. To evaluation of adsorption dynamics and effect of pressure on elimination of trace impurities, helium purificat...
متن کاملAnalyzing the plan accommodation and constructing the buildings components by using analytical hierarchy process AHP, the case study of Qazvin province in Iran
The quick growth of the population and the increasing need of the demands for developing caused the construction and production process formed with increasing technology than the past, this speeding in construction process caused the construction quality and executing engineering points and the lack of accommodation of construction to the plans increase more. So the purpose of this article is ...
متن کامل