Scenario analysis within a multi-stage stochastic programming formulation offers an attractive framework for modelling uncertainties in long-range planning models. However, whether the expected outcome is implicitly / explicitly evaluated, such formulations lead to computationally intensive optimization problems. Focussing here on the scenario planning / multi-period approach for mixed integer linear programming (MILP) problems under uncertainty, this paper presents a novel decomposition strategy for its solution. The proposed algorithm circumvents the direct solution of the largescale deterministic equivalent MILP problem by exploiting its block-angular structure. Through the use of parametric programming, separable subproblems are formulated and solved in parallel at a relatively low computational cost. Computational studies show that the algorithm is ideally suited for problems where a large number of scenarios inhibits the direct solution of the deterministic equivalent problem.
منابع مشابه
A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملA Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach
The production planning is an important problem in most of manufacturing systems in practice. Unlike many researches existing in literature, this problem encounters with great uncertainties in parameters and input data. In this paper, a single machine capacitated production planning problem is considered and a linear programming formulation is presented. The production costs are assumed to be u...
متن کاملOptimal production strategy of bimetallic deposits under technical and economic uncertainties using stochastic chance-constrained programming
In order to catch up with reality, all the macro-decisions related to long-term mining production planning must be made simultaneously and under uncertain conditions of determinant parameters. By taking advantage of the chance-constrained programming, this paper presents a stochastic model to create an optimal strategy for producing bimetallic deposit open-pit mines under certain and uncertain ...
متن کاملA Robust Reliable Forward-reverse Supply Chain Network Design Model under Parameter and Disruption Uncertainties
Social responsibility is a key factor that could result in success and achieving great benefits for supply chains. Responsiveness and reliability are important social responsibility measures for consumers and all stakeholders that strategists and company managers should be concerned about them in long-term planning horizon. Although, presence of uncertainties as an intrinsic part of supply chai...
متن کاملA Robust Reliable Closed Loop Supply Chain Network Design under Uncertainty: A Case Study in Equipment Training Centers
The aim of this paper is to propose a robust reliable bi-objective supply chain network design (SCND) model that is capable of controlling different kinds of uncertainties, concurrently. In this regard, stochastic bi-level scenario based programming approach which is used to model various scenarios related to strike of disruptions. The well-known method helps to overcome adverse effects of disr...