Borman Expressway Atms Equipment Evaluation
نویسندگان
چکیده
منابع مشابه
School of Civil Engineering Indiana Department of Transportation Joint Highway Research Project Fhwa/in/jhrp-96/15 Final Report Borman Expressway Atms Equipment Evaluation Borman Expressway Atms Equipment Evaluation Prepared in Cooperation with the Indiana Department of Transportation and Federal Highway Administration
The contents of this report reflect the views of the authors, who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Indiana Department of Transportation or the Federal Highway Administration at the time of publication This report does not constitute a standard, specification, or regulation. An A...
متن کاملAn Electronic Surveillance and Control System for Traffic Management on the Borman Expressway
متن کامل
Image Processing Traffic Flow Measuring System of Hokuriku Expressway
The section between Nadachi-Tanihama .Ni igata Prefecture and Asahi .Toyama Prefecture(59.9km) of the Hokur iku Expressway was opened on July the 20th in 1988. This means that all the line of the Hokuriku Expressway was opened. This area has 22 tunnels and we built ImageProcessing Traffic Flow Measuring System as the part of NEC ITV System. It consists of 11 image-processing equipents and 54 I ...
متن کاملThe Model of Vague Comprehensive Evaluation for Energy Conservation of Expressway Construction Project and its Research Application
Energy conservation of expressway construction project is urgent in our country, its theoretical research and practice is pretty weak, lack in integrity and corrects conservative evaluation-index system and method. This paper has introduced the theory of vague comprehensive evaluation and the theory of attribute, established a vague comprehensive evaluation model for the energy conservation of ...
متن کامل