An Estimating Method for IT Project Expected Duration Oriented to GERT

نویسندگان

  • Li Yu
  • Meiyun Zuo
چکیده

Reworking in developing software exists widely in IT project management. But the current estimating methods on project duration cannot deal well with this problem. In this paper, some key concepts, such as adjusted activity, adjusted GERT network, expected project duration, expected critical path, are firstly defined. Then authors study estimating method on project duration for different rework modes, including serial, paratactic, and combined structure by encapsulating of activities. Finally, a general estimating method on IT project duration oriented to GERT is presented, and detailed steps are illustrated with an example project on IT software development.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Expected Duration of Dynamic Markov PERT Networks

Abstract : In this paper , we apply the stochastic dynamic programming to approximate the mean project completion time in dynamic Markov PERT networks. It is assumed that the activity durations are independent random variables with exponential distributions, but some social and economical problems influence the mean of activity durations. It is also assumed that the social problems evolve in ac...

متن کامل

ارائه یک سیستم کنترل فازی برای تخمین زمان ختم پروژه در شبکه‌های گرت

Project scheduling is one of the main fundamentals in project management so the related progressive methods which consider most of the project limitations would be valuable. The GERT (Graphical Evaluation and Review Technique) is a network analysis method which has unique capabilities in comparison with other conventional scheduling methods. On the other hand and, there is no definite conformit...

متن کامل

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

Comparison of physical and statistical methods for estimating probable maximum precipitation in southwestern basins of Iran

The probable maximum precipitation (PMP) is the greatest depth of precipitation for a given duration that is physically possible over a given size storm area at a particular geographical location at a certain time of the year. In this study a physically based method was compared with a statistical procedure to calculate PMP in the southwest arid regions of Iran. In order to estimate PMP using a...

متن کامل

An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks

  We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007