Integration of Constraint Reasoning, and Simulation models in Forest Harvest Scheduling

نویسنده

  • Junas Adhikary
چکیده

Forest harvest planning and scheduling problem is an important part of forest resource management. It is a complex task requiring expertise and integration of multidisciplinary elds. We review mathematical programming as applied to forest harvesting problem. The review suggests that long term scheduling is diicult because of the prohibitive size of the model. Such long term scheduling allows one to see if sustainable forestry is actually being practiced. Thus, this method alone is not suucient for sustainable forest harvesting. In this paper we propose how constraint reasoning techniques from Artiicial Intelligence may be used along with simulation modelling to solve forest harvesting problem eeectively. We show how these techniques can be used to better model forest harvest plans and describe our work in progress towards building better forest harvest scheduling system.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Time Efficiency of Selected Types of Adjacency Constraints in Solving Unit Restriction Models

Abstract: Spatial restrictions of harvesting have been extensively studied due to a number of environmental, social and legal regulations. Many spatial restrictions are defined by adjacency constraints, for which a number of algorithms have been developed. Research into the unit restriction model (URM) using a branch and bound algorithm focused on decreasing the number of adjacency constraints ...

متن کامل

Thesis a Spatial Stochastic Programming Model for Timber and Core Area Management under Risk of Stand-replacing Fire

Forest harvest scheduling has been modeled using deterministic and stochastic programming models. Past models seldom address explicit spatial forest management concerns under the influence of natural disturbances. In this research study, we employ multistage full recourse stochastic programming models to explore the challenges and advantages of building spatial optimization models that account ...

متن کامل

Optimal Parameter Settings for Solving Harvest Scheduling Models with Adjacency Constraints

Optimal parameter settings to improve the efficiency of solving harvest scheduling models with adjacency constraints were examined using Ilog’s Cplex R © 11.2 optimizer tuning tool. A total of 160 randomly generated hypothetical forests were created with either 50 or 100 stands and four age-class distributions. Mixed integer programming problems were formulated in Model I form with four differe...

متن کامل

An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling

Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...

متن کامل

Scheduling and Stochastic Capacity Estimation of an EV Charging Station with PV Rooftop Using Queuing Theory and Random Forest

Power capacity of EV charging stations could be increased by installing PV arrays on their rooftops. In these charging stations, power transmission can be two-sided when needed. In this paper a new method based on queuing theory and random forest algorithm proposed to calculate net power of charging station considering random SOC of EV’s. Due to estimation time constraints, a queuing model with...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007