Reducing performance uncertainties with monitoring data

نویسنده

  • Jianye Ching
چکیده

In this research, a new method is proposed to update system reliability based on data recorded by instruments and sensors installed on geotechnical systems to reduce uncertainties. The method is founded on Bayesian analysis and Monte Carlo simulation and is capable of estimating the functional relationship between the updated failure probability and the monitoring value. It is shown that as long as the probability distribution of the uncertainties is given, this relationship can be obtained prior to the monitoring process. This new method may be applied to safety monitoring of in-construction geotechnical systems and monitoring of existing geotechnical systems.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Feature Selection in Structural Health Monitoring Big Data Using a Meta-Heuristic Optimization Algorithm

This paper focuses on the processing of structural health monitoring (SHM) big data. Extracted features of a  structure are reduced using an optimization algorithm to find a minimal subset of salient features by removing noisy, irrelevant and redundant data. The PSO-Harmony algorithm is introduced for feature selection to enhance the capability of the proposed method for processing the  measure...

متن کامل

Implementation of Random Forest Algorithm in Order to Use Big Data to Improve Real-Time Traffic Monitoring and Safety

Nowadays the active traffic management is enabled for better performance due to the nature of the real-time large data in transportation system. With the advancement of large data, monitoring and improving the traffic safety transformed into necessity in the form of actively and appropriately. Per-formance efficiency and traffic safety are considered as an im-portant element in measuring the pe...

متن کامل

Optimal Reconfiguration in Smart Distribution Network in the Presence of DG Resources under Uncertainties

Due to the growth and expansion of cities and the unchanged distribution network, an important issue for electricity distribution companies is customer satisfaction with the quality of received power. It is clear that with the expansion of load centers, the amount of line power flow increases, that creates problems such as voltage drop and increased losses. Distribution network reconfiguration ...

متن کامل

Predicting Failure in the Hydraulic Lift Structures with Monitoring and Fuzzy Logic

There are several strategies for maintenance and repairing of devices in industry. However, they are still confronted with many uncertainties. A hydraulic lifting device after ten years of working in a technical center in Isfahan is faced with uncertainty in terms of reliability. Being able to know the reliability of pieces means predicting failure occurrences, which is accomplished by conditio...

متن کامل

Predicting Failure in the Hydraulic Lift Structures with Monitoring and Fuzzy Logic

There are several strategies for maintenance and repairing of devices in industry. However, they are still confronted with many uncertainties. A hydraulic lifting device after ten years of working in a technical center in Isfahan is faced with uncertainty in terms of reliability. Being able to know the reliability of pieces means predicting failure occurrences, which is accomplished by conditio...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006