Resource Estimation in Software Engineering
نویسندگان
چکیده
منابع مشابه
1 Resource Estimation in Software Engineering
This paper presents a comprehensive overview of the state of the art in software resource estimation. We describe common estimation methods and also provide an evaluation framework to systematically compare and assess alternative estimation methods. Though we have tried to be as precise and objective as possible, it is inevitable that such a comparison exercise be somewhat subjective. We howeve...
متن کاملInvestigation of linear and non-linear estimation methods in highly-skewed gold distribution
The purpose of this work is to compare the linear and non-linear kriging methods in the mineral resource estimation of the Qolqoleh gold deposit in Saqqez, NW Iran. Considering the fact that the gold distribution is positively skewed and has a significant difference with a normal curve, a geostatistical estimation is complicated in these cases. Linear kriging, as a resource estimation method, c...
متن کاملGrade estimation of Zu2 Jajarm deposit by considering imprecise variogram model parameters based on the extension principle
Nowadays, kriging has been accepted as the most common method of grade estimation in mineral resource evaluation stage. Access to the crisp assay data and a variogram model are the necessary means for the utilization of this method. Since fitting a crisp variogram model is generally difficult, if not impossible, the fitted theoretical model is usually tainted with uncertainty due to various rea...
متن کاملCase Mix Planning using The Technique for Order of Preference by Similarity to Ideal Solution and Robust Estimation: a Case Study
Management of surgery units and operating room (OR) play key roles in optimizing the utilization of hospitals. On this line Case Mix Planning (CMP) is normally applied to long term planning of OR. This refers to allocating OR time to each patient’s group. In this paper a mathematical model is applied to optimize the allocation of OR time among surgical groups. In addition, another technique is ...
متن کاملConvex Programming-Based Resource Management for Uncertain Execution Platforms
An approach to constrained resource allocation for real time software components executing on nondeterministic hardware is considered. A model for resource consumption based on execution rate is investigated together with an eventbased measurement and parameter estimation scheme. Finally, an algorithm for real time constrained optimization of resources is presented together with results from a ...
متن کامل