Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO

نویسندگان

  • Elahe Fallah-Mehdipour
  • Omid Bozorg Haddad
  • Mahmoud M. Rezapour Tabari
  • Miguel A. Mariño
چکیده

The time-cost trade-off problem is a known bi-objective problem in the field of project management. Recently, a new parameter, the quality of the project has been added to previously considered time and cost parameters. The main specification of the time-cost trade-off problem is discretization of the decision space to limited and accountable decision variables. In this situation the efficiency of the traditional methods decrease and applying of the evolutionary algorithms is necessary. In this paper, two evolutionary algorithms that originally search the decision space in a continuous manner including: (1) multi-objective particle swarm optimization (MOPSO) and (2) nondominated sorting genetic algorithm (NSGA)-II, are considered as the optimization tools to solve two construction project management problems. These problems are both in discrete domain including two or tree objectives, separately. In this regard, some procedures has been suggested and then applied to adopt both algorithms capable in solving the problems in a discrete domain. Results show the advantages and effectiveness of the used procedures in reporting the optimal Pareto for the optimization problems. Moreover, the NSGA-II is more successful in determining optimal alternatives in both time-cost trade-off (TCTO) and time-cost-quality trade-off (TCQTO) problems than the MOPSO algorithm. 2011 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects

Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...

متن کامل

A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES

In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...

متن کامل

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

A MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS

Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...

متن کامل

Selecting and allocating the orders to suppliers considering the conditions of discount using NSGA-II and MOPSO

In this article, a multi objective model is presented to select and allocate the order to suppliers in uncertainty condition and in a multi source, multi customer and multiproduct case in a multi period state at two levels of supply chain. Objective functions considered in this study as the measures to evaluate suppliers are cost including purchase, transportation and ordering costs, timely del...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 39  شماره 

صفحات  -

تاریخ انتشار 2012