Production Lots as Determinant of Paper Production Lead Time Performance

نویسندگان

  • Pekka Koskinen
  • Olli-Pekka Hilmola
چکیده

Lead time performance of entire production operations, but also the whole supply chain is widely discussed issue in the contemporary supply chain research. After Just-in-Time (JIT) revolution during 80’s, most of the researchers were thinking that lead time is not major research interest subject, after companies have implemented new methods in production and supplier network related operations (e.g. Mistry, 2005; Chen et al., 2005; Kros et al., 2006). However, ever larger corporations in manufacturing, larger factories, offshore outsourcing opportunities, new emerging markets, and larger markets overall to be served by each factory has resulted into the situation that lead time performance is still an issue – for example, in paper production number of mills at European soil has decreased during the last two decades by more than 25%, but production volume has doubled (CEPI, 2007). As purchasing and manufacturing altogether take major proportion from total costs ABSTRACT

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

JOINT ECONOMIC LOT SIZING PROBLEM IN A TWO ECHELON PRODUCTION SYSTEM WITH FINITE PRODUCTION RATE AND LEAD TIME

In this study, a two-echelon supplier-manufacturer system with finite production rate and lead time is proposed. It is assumed that shortage is not permitted and the lot size of manufacturer (second echelon) is m-factors of the lot size of supplier (first echelon) and supplier can supply the manufacturer’s lot size in several shipments in each cyc...

متن کامل

A Production Planning and Scheduling Model for Semiconductor Wafer Manufacturing Plants

In this paper, a comprehensive production planning and scheduling model is developed for a typical semiconductor plant (fab). The proposed model includes two decision making policies on production planning and scheduling of the semiconductor manufacturing systems, release and dispatching policies. The proposed release and dispatching policies decides on flow of wafer lots in the fab in order to...

متن کامل

Optimal flexible capacity in newsboy problem under stochastic demand and lead-time

In this paper, we consider a newsvendor who is going to invest on dedicated or flexible capacity, our goal is to find the optimal investment policy to maximize total profit while the newsvendor faces uncertainty in lead time and demand simultaneously. As highlighted in literature, demand is stochastic, while lead time is constant. However, in reality lead time uncertainty decreases newsvendor's...

متن کامل

Lot Sizing and Lead Time Quotations in Assembly Systems

In this paper, a simultaneous lead time quotation and lot sizing problem in an assembly system is investigated. We address a production system with a product that has deterministic demand over a T-period planning horizon and is produced in lots because of the economy of scale. If a lot is completed before the demand period, inventory carrying cost is incurred. On shortages, a lead time is quote...

متن کامل

An integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production

In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • IJISSCM

دوره 2  شماره 

صفحات  -

تاریخ انتشار 2009