The Scheduling of Rail at Union Pacific Railroad
نویسندگان
چکیده
The Union Pacific Railroad (UPRR) has over 3 1,000 miles of track covering a 24 state region. Planning and scheduling the production, packaging, delivery, and pickup of rail, involved in the maintenance of this network, is a very complex task. Manually scheduling only a subset of the resources required has historically taken several days to accomplish. Moreover, the inability to fully schedule all resources can lead to inefficient resource utilization. This paper describes the Rail Train Scheduler (RTS), designed and developed to capture the expertise of the UPRR scheduler, generate production schedules of all the resources involved, and provide a decision support tool for determining the best mix of resources required. RTS is an expert system that uses constraint satisfaction and domain specific heuristics to produce good, low cost schedules. It has been deployed since January, 1996. UPRR anticipates a savings of about $500,000 per year from the use of RTS.
منابع مشابه
Strategies for Effective Rail Track Capacity Usage
In the United States, railways are the major means to trans-continentally move goods from ports to the various inland destinations. Due to mergers and abandonment of rail lines, there has been a reduction in the track capacity, concentrating rail traffic to fewer lines. In addition to this, booming trade with Pacific Rim nations has seen the annual trade in the Ports of Los Angeles and Long Bea...
متن کاملTrain Schedule Optimization in Public
Attractive train schedules are quite important for the success of public rail transport. We consider schedules which are repeated after some xed time period. Periodicity is a well accepted, convenient attribute of all major railroad systems. Since trains share the public railroad network, we have to handle many connicting demands. Increasing competition from transportation alternatives as well ...
متن کاملTechnical and Safety Evaluation of the Southern California Regional Rail Authority Positive Train Control Deployment Project:Challenges and Lessons Learned
Positive Train Control (PTC), often referred to as Communication Based Train Control (CBTC), has been on the National Transportation Safety Board’s (NTSB) “Most Wanted List of Transportation Safety Improvements” for several decades as a safety-enabling system. The Rail Safety Improvement Act of 2008 mandated its implementation after the September 12, 2008, Chatsworth, California, collision betw...
متن کاملIntegration of Passenger and Freight Rail Scheduling
In the United States, the freight railway industry is already running without much excess capacity. Hence, better planning and scheduling tools are needed to effectively manage the scarce resources, to cope with the rapidly increasing demand for railway transportation. The integration of freight train and passenger train scheduling and dispatching is an important railroad management task since ...
متن کاملAutomated Recognition of Railroad Infrastructure in Rural Areas from LIDAR Data
This study is aimed at developing automated methods to recognize railroad infrastructure from 3D LIDAR data. Railroad infrastructure includes rail tracks, contact cables, catenary cables, return current cables, masts, and cantilevers. The LIDAR dataset used in this study is acquired by placing an Optech Lynx mobile mapping system on a railcar, operating at 125 km/h. The acquired dataset covers ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1997