Minimizing the makespan in the non-preemptive job-shop scheduling with limited machine availability
نویسنده
چکیده
This paper addresses the makespan minimization in a job-shop environment where the machines are not available during the whole planning horizon. The disjunctive graph model is used to represent the schedules and the concept of blocks is generalized to include the unavailability periods of machines. To solve the problem, we develop a taboo thresholding heuristic that uses a new block-based neighborhood function. Some sufficient conditions to eliminate the evaluation of non-improving moves are proposed. Experiments performed on existing problem instances of the literature show the efficiency of the proposed
منابع مشابه
Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملOn-Line Scheduling of Two-Machine Open Shops Where Jobs Arrive Over Time
We investigate the problem of on-line scheduling two-machine open shops with the objective of minimizing the makespan. Jobs arrive independently over time, and the existence of a job is not known until its arrival. In the clairvoyant on-line model, the processing requirement of every job becomes fully known at the arrival of the job, while in the non-clairvoyant on-line model, this processing r...
متن کاملMinimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...
متن کاملNon-preemptive two-machine open shop scheduling with non-availability constraints
We study a two-machine open shop scheduling problem, in which the machines are not continuously available for processing. No preemption is allowed in the processing of any operation. The objective is to minimize the makespan. We consider approximability issues of the problem with more than one non-availability interval and present an approximation algorithm with a worst-case ratio of 4/3 for th...
متن کاملOptimality of the flexible job shop scheduling system based on Gravitational Search Algorithm
The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 59 شماره
صفحات -
تاریخ انتشار 2010