Using Resource Constraints to Control the Incremental Development of Large Scale MIS Projects

نویسندگان

  • SULEIMAN K. KASSICIEH
  • ROBERT S. TRIPP
چکیده

Information Resources Management Journal • 24 Incremental MIS design and development methodologies have received limited attention in the MIS literature. This paper describes incremental methodologies appropriate for very large scale MIS developments which can cost millions of dollars and take years to develop. This paper describes a “resource constrained” implementation planning process designed to control both the costs of incremental projects and the functional evolution of the system. The paper also discusses how the process was used in a very large scale system development. Using Resource Constraints to Control the Incremental Development of Large Scale MIS Projects

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation

Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...

متن کامل

Identification of Pattern used in Determination of Critical Success Factors in ITS Projects, Case Study: Road Maintenance and Transportation Organization

One of the risks recognized by relevant authorities is the risk of outsourcing ITS projects. The purpose of this study was to design and explain the pattern of determining the critical success factors in outsourcing large-scale ITS projects in the Ministry of Roads and Urban Development (Road Maintenance and Transportation Organization). This study was performed using qualitative method. The pa...

متن کامل

Conceptual Model of knowledge documentation of Human Resource in Executive Projects of oil industry

It is obvious that in our country, a large part of capital and budget of projects is spent for training and experience of managers who is responsible for managing and guiding the projects, while the experience may be archived in chest or shelves of managers and other executives. In most of projects, there are using trial and error methods in using of experiences and knowledge, as a result large...

متن کامل

Qualitative Sustainability Assessment of the Large- Scale Redevelopment Plan in Samen District of Mashhad

Redevelopment of distressed and blighted areas are targeted by most of development policies.However, a number of policies have been changed as the result of the ineffectiveness of the previous experiences, theincompatibility of the development tools and plans, the lack of financial resources or social movements. Large-scaleredevelopment projects have usually been considered as the powerful tool...

متن کامل

Constructive Dynamisms of Large-Scale Urban Projects by the Space Political Economy Approach; a Case Study of Mashhad Metropolis

Aims: The development of large-scale construction projects has transformed the shape of cities towards specific objectives and based on economic and political perspectives that dominate policy-making and planning in cities. The purpose of the research was to study and analyze the spatiality of Mashhad construction mega-projects and to explain the constructive forces and dynamisms of these proje...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017