A Hybrid Approach for Solving Large Scale Crew Scheduling Problems

نویسندگان

  • Tallys H. Yunes
  • Arnaldo Vieira Moura
  • Cid C. de Souza
چکیده

We consider several strategies for computing optimal solutions to large scale crew scheduling problems. Provably optimal solutions for very large real instances of such problems were computed using a hybrid approach that integrates mathematical and constraint programming techniques. The declarative nature of the latter proved instrumental when modeling complex problem restrictions and, particularly, in efficiently searching the very large space of feasible solutions. The code was tested on real problem instances, containing an excess of 1.8 × 10 entries, which were solved to optimality in an acceptable running time when executing on a typical desktop PC.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cockpit Crew Pairing Problem in Airline Scheduling: Shortest Path with Resources Constraints Approach

Increasing competition in the air transport market has intensified active airlines’ efforts to keep their market share by attaching due importance to cost management aimed at reduced final prices. Crew costs are second only to fuel costs on the cost list of airline companies. So, this paper attempts to investigate the cockpit crew pairing problem. The set partitioning problem has been used for ...

متن کامل

Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines

In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...

متن کامل

Solving Flexible Job Shop Scheduling with Multi Objective Approach

  In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...

متن کامل

Solving Large Scale Crew Scheduling Problems by using Iterative Partitioning

This paper deals with large-scale crew scheduling problems arising at the Dutch railway operator, Netherlands Railways (NS). NS operates about 30,000 trains a week. All these trains need a driver and a certain number of conductors. No available crew scheduling algorithm can solve such huge instances at once. A common approach to deal with these huge weekly instances, is to split them into sever...

متن کامل

A discrete-event optimization framework for mixed-speed train timetabling problem

Railway scheduling is a complex task of rail operators that involves the generation of a conflict-free train timetable. This paper presents a discrete-event simulation-based optimization approach for solving the train timetabling problem to minimize total weighted unplanned stop time in a hybrid single and double track railway networks. The designed simulation model is used as a platform for ge...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000