Price caps and the error in X-factor calculations

نویسنده

  • Noel D. Uri
چکیده

Calculation of the X-factor used for price caps has a fundamental flaw when it is based on conventional growth accounting total factor productivity analysis. This error is discussed and the appropriate corrective action is indicated. In an example based on the X-factor used for determining the change in the price for local exchange carriers’ interstate access service in the United States, it is shown that the appropriate X-factor is about 25 percent greater than that based on conventional growth accounting total factor productivity analysis. Published by Elsevier Science B.V.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Interpretation of In-air Output Ratio of Wedged Fields in Different Measurement Conditions

Introduction: The head scatter factor (Sc) is one of the important parameters for monitor unit (MU) calculation. There are multiple factors that impact the Sc values, such as, head structures, back scattering in to dose monitoring chambers, wedges and so on. This study aimed to investigate the variations of SC with different build-up cap materials, wall thickness, Source to ...

متن کامل

Price Caps, Rate-of-Return Regulation, and the Cost of Capital

the rule is RPI + K, where K represents both expected productivity gains and a permitted annual increase in the real price of water to allow for quality improvements (think of it as RPI – X + Q, where Q stands for the quality improvement). Since 1989, price caps have also been used in the United States to adjust the prices charged by the long-distance telephone company AT&T. In New Zealand, a p...

متن کامل

Modeling Critical Flow through Choke for a Gas-condensate Reservoir Based on Drill Stem Test Data

Gas-condensate reservoirs contain hydrocarbon fluids with characteristics between oil and gas reservoirs and a high gas-liquid ratio. Due to the large gas-liquid ratio, wellhead choke calculations using the empirical equations such as Gilbert may contain considerable error. In this study, using drill stem test (DST) data of a gas-condensate reservoir, coefficients of Gilbert equation was modifi...

متن کامل

Measurements of output factors using different ionization chambers and build up caps

Background: The aim of this work was to study the output factors for Linac using different ionization chambers and build up caps. Materials and Methods: Output factors were measured for open square fields (3 × 3 cm to 40 × 40 cm) defined by collimator jaws for 6 and 15 MV photon beams from a Varian Clinac 2100C accelerator were measured. The measurements in air were performed using Com...

متن کامل

نقش دینامیک شبکه در ابررسانای La2-xBaxCuO4 به روش DFT

Electron-phonon coupling parameters are calculated for La2-x BaxCuO4 cuprate superconductor in a wide range of dopings, from undoped to overdoped compounds. In this study we aim to study the quality of such calculations based on DFT method so, the results of σ GGA+U electronic structure calculations are also investigated. The obtained value for electron-phonon coupling is in the same order of p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Information Economics and Policy

دوره 12  شماره 

صفحات  -

تاریخ انتشار 2000