A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers
نویسندگان
چکیده
This paper investigates the hybrid flowshop scheduling with finite intermediate buffers, whose objective is to minimize the sum of weighted completion time of all jobs. Since this problem is very complex and has been proven strongly NP-hard, a tabu search heuristic is proposed. In this heuristic there are two main features. One is that a scatter search mechanism is incorporated to improve the diversity of the search procedure. And the other is that a permutation ofN jobs representing their processing order in the first stage instead of a complex complete schedule is used to denote a solution. Computational experiments on randomly generated instances with different structures show that the proposed tabu search heuristic can provide good solutions compared to both the lower bounds and the algorithm proposed for this problem in a lately published literature. 2007 Elsevier Ltd. All rights reserved.
منابع مشابه
An Improved Tabu Search Algorithm for Job Shop Scheduling Problem Trough Hybrid Solution Representations
Job shop scheduling problem (JSP) is an attractive field for researchers and production managers since it is a famous problem in many industries and a complex problem for researchers. Due to NP-hardness property of this problem, many meta-heuristics are developed to solve it. Solution representation (solution seed) is an important element for any meta-heuristic algorithm. Therefore, many resear...
متن کاملA novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study
Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...
متن کاملA heuristic approach for multi-stage sequence-dependent group scheduling problems
We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...
متن کاملSimultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts
Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem...
متن کاملLot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors
This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & OR
دوره 36 شماره
صفحات -
تاریخ انتشار 2009